My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
items and the Contractor does not submit a letter, all I 1 items. If work is performed on the to <br /> 2 of the previous material on hand payment will be deducted on the estimate. Partial <br /> 3 payment for materials on hand shall not constitute acceptance. Any material will be <br /> I <br /> 4 rejected if found to be faulty even if partial payment for it has been made. <br /> 5 <br /> 6 1-09.9(Payments).RTF <br /> 7 1-09.9 Payments <br /> 8 (March 13, 2012 APWA GSP) <br /> 9 1 10 Delete the first four paragraphs and replace them with the following: <br /> 11 <br /> I <br /> 12 The basis of payment will be the actual quantities of Work performed according to the <br /> 13 Contract and as specified for payment. <br /> 14 I 15 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> 16 Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> 17 performed on a monthly basis. A breakdown is not required for lump sum items that <br /> I <br /> 18 include a basis for incremental payments as part of the respective Specification. Absent <br /> 19 a lump sum breakdown, the Project Engineer will make a determination based on <br /> 20 information available. The Project Engineer's determination of the cost of work shall be <br /> I <br /> 21 final. <br /> 22 <br /> 23 Progress payments for completed work and material on hand will be based upon I 24 progress estimates prepared by the Engineer. A progress estimate cutoff date will be <br /> 25 established at the preconstruction conference. <br /> 26 I 27 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 28 commences the work, and successive progress estimates will be made every month <br /> 29 thereafter until the Completion Date. Progress estimates made during progress of the <br /> I <br /> 30 work are tentative, and made only for the purpose of determining progress payments. <br /> 31 The progress estimates are subject to change at any time prior to the calculation of the <br /> 32 final payment. <br /> 33 <br /> Il <br /> 34 The value of the progress estimate will be the sum of the following: <br /> 35 1. Unit Price Items in the Bid Form βthe approximate quantity of acceptable units of <br /> I <br /> 36 work completed multiplied by the unit price. <br /> 37 2. Lump Sum Items in the Bid Form β based on the approved Contractor's lump sum <br /> 38 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 1 <br /> 39 determination. <br /> 40 3. Materials on Hand β 100 percent of invoiced cost of material delivered to Job site <br /> 41 or other storage area approved by the Engineer. I 42 4. Change Orders β entitlement for approved extra cost or completed extra work as <br /> 43 determined by the Engineer. <br /> 44 <br /> 45 Progress payments will be made in accordance with the progress estimate less: <br /> 46 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 47 2. The amount of progress payments previously made; and <br /> I <br /> 48 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> 49 Contract Documents. <br /> 50 <br /> 1 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 32 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> I <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.