My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Pre-level course isnotanticipated n ' <br /> onany ofthe selected streets. If, however, after <br /> 2 plaining operations, drivability issues cannot be resolved with 2" overlay, pre-level <br /> 3 will be required as directed and paid for by "HMA Class 1/2" PG 64-22", per ton. <br /> 4 Contractor is strongly encouraged to bid the work to cover their cost of pre-level <br /> 5 operations. <br /> 6 <br /> 7 GLF 5-04.3(18).DOCX <br /> 8 5-04.3(18) HMA NIGHT PAVING <br /> 9 (******) <br /> 10 <br /> 11 Vacant section 5-04.3(18) of the standard specifications is replaced with the following: <br /> 12 <br /> 13 The Contractor is responsible for providing advance notice of night paving <br /> 14 operations to transit and emergency response agencies at least 72 hours before <br /> 15 beginning this work. Prior to release of this information, the City must be notified. <br /> 16 <br /> 17 <br /> 18 GLF 5-04.4.DOCX <br /> 19 5-04.4 Measurement <br /> 20 <br /> 21 Section 5-04.4 of the standard specifications is deleted and replaced with the following: <br /> 22 <br /> 23 (******) <br /> 24 "Planing Bituminous Pavement (2" Deep)", shall be measured by the square yard. <br /> 25 <br /> 26 "HMA Class 1/2", PG 64-22", shall be measured by the ton. <br /> 27 <br /> 28 <br /> 29 GLF 5-04.5.DOCX <br /> 30 5-04.5 Payment I <br /> 31 <br /> 32 Section 5-04.5 of the standard specifications is deleted and replaced with the following: <br /> 33 <br /> 34 (******) <br /> 35 Payment will be made in accordance with Section 1-04.1, for each of the following bid I <br /> 36 items that are included in the proposal: <br /> 37 <br /> 38 "HMA Class 1/" PG 64-22", per ton. <br /> 39 <br /> 40 The unit contract price per ton for "HMA Class '/2" PG 64-22", shall be full compensation <br /> 41 for all costs incurred to carry out the requirements of Section 5-04 except for those <br /> 42 costs included in other items which are included in the sub-section and which are <br /> 43 included in the proposal. <br /> 44 <br /> 45 HMA for Pre-leveling, if required by the Engineer, will be paid for under bid item, "HMA <br /> 46 Class '/2" PG 64-22", per ton. <br /> 47 <br /> 48 All costs for "Asphalt Tack Coat", "Anti Stripping Additive", and "Compaction Adjustment" I <br /> 49 shall be included in the unit contract price per ton for "HMA Class 1/2" PG 64-22", per <br /> 50 ton. <br /> 51 ' <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 40 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.