Laserfiche WebLink
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The unit price for foundation material shall include all costs of furnishing, hauling, <br /> stockpiling, placing, grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for dewatering and over-excavation, <br /> removal and disposal of unsuitable material below the pipe zone or roadway subgrade, and <br /> shall be full compensation for all labor, materials, tools, and equipment necessary including <br /> haul and tipping fees to dispose of the material. <br /> Bid Item 17 - Temporary Roadway Patch <br /> Measurement and Payment: Lump Sum (LS) I <br /> No measurement will be made for the lump sum item Temporary Roadway Patch. <br /> Payment for the lump sum item Temporary Roadway Patch shall be a one-time lump sum <br /> regardless of how many times Temporary Roadway Patch is placed, removed, replaced, or <br /> relocated. The lump sum price shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the Work as defined in the Standard <br /> Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans. 1 <br /> Bid Item 18 - Relocate Existing Water Main, 4-Inch Diam. <br /> Bid Item 19 - Relocate Existing Water Main, 6-Inch Diam. I <br /> Bid Item 20 - Relocate Existing Water Main, 8-Inch Diam. <br /> Measurement and Payment: Unit Price per Linear Foot I <br /> The unit contract price for Relocate Existing Water Main, _-Inch Diam., shall constitute full <br /> compensation for all labor, bedding and backfill materials, tools and equipment necessary, <br /> required for complete installation along the run of each pipe size, as shown on the Plans <br /> and specified herein, and additionally, shall include, but not be limited to, the following: <br /> 1. Unit contract price shall include all coordination efforts with the City and assistance as <br /> City forces will provide pipe material, fittings, couplings and mechanical restraint <br /> systems and install, disinfect and test the pipe for the water main relocation and make <br /> the connection to the existing system. <br /> 2. Removal of structures or obstructions not specifically covered under other Bid Items. <br /> This shall include, but not be limited to, removal and disposal of the existing thrust <br /> blocks, miscellaneous landscaping, and sod as indicated on the Plans. <br /> 3. Trench excavation and dewatering, furnishing, placing and compacting sand backfill for <br /> pipe bedding, furnishing, placing and compacting suitable native material for trench <br /> backfill and placing and compacting imported backfill material. No extra payment shall <br /> be made for removing, loading, hauling, and disposing of displaced and unsuitable <br /> material. <br /> 4. Steel sheeting for covering open excavations left overnight to protect public from injury <br /> and property damage. <br /> 5. Maintenance, restoration and/or relocation, if required, of culverts, storm drainage <br /> pipe, other utilities and structures affected by construction that are to remain. <br /> 6. Temporary and permanent thrust blocking and dead man blocks. <br /> 7. Ethafoam pads or sand backfill between water main and other pipes. <br /> 111 <br /> 8. Maintenance of existing water main and provisions for interim water service. <br /> 9. Extra depth, including excavation, backfill and compaction required to clear known <br /> buried utilities or other known obstacles. <br /> 10. The costs for pot-holing and excavation required to determine exact depths and <br /> locations of other utilities shall be included with this Work with no direct compensation <br /> made. <br /> 111 <br /> North Wetmore Stormwater Separation February, 2018 <br /> WO No—UP3659 Division B—BID ITEM DESCRIPTIONS <br /> SP -8 I <br />