Laserfiche WebLink
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit price per linear foot for construction of concrete curbs shall be full compensation <br /> for all materials, tools, labor and equipment necessary to construct new curb in place in <br /> accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Crushed surfacing top course placed under curb is incidental to the <br /> curb item. <br /> Bid Item 46 - Concrete Curb and Gutter, Type A-1 <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit price per linear foot for construction of concrete curb and gutter shall be full <br /> compensation for all materials, tools, labor and equipment necessary to construct new curb <br /> and gutter in place in accordance with the Plans, COE Standard Drawings, Standard <br /> Specifications and these Special Provisions. Crushed surfacing top course placed under <br /> curb and gutter is incidental to the curb item. <br /> Bid Item 47 - Asphalt Extruded Curb <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot along the line and slope of the completed curb as <br /> approved by the Inspector. <br /> The unit price per linear foot for construction of curb shall be full compensation for all <br /> materials, tools, labor and equipment necessary to construct new curb and gutter in place I <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Asphalt tack coat placed under curb is incidental to this bid item. <br /> Bid Item 48 - Asphalt Wedge Curb I <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot along the line and slope of the completed curb as <br /> approved by the Inspector. <br /> The <br /> unit price per linear foot for construction of curb shall be fulI CGmNai ioatioi for all <br /> materials, <br /> materials, tools, labor and equipment necessary to construct new curb and gutter in place <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Asphalt tack coat placed under curb is incidental to this bid item. <br /> Bid Item 49 - Replace Chain Link Fence and Gate I <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid item for replace chain link fence and gate shall be full compensation for <br /> furnishing all labor, materials, and other equipment necessary for removal and restoring <br /> and replacing the chain link fence and gate removed by the contractors work in accordance <br /> with Standard Plans and Specifications and these Special Provisions, in locations shown <br /> on the Plans. <br /> Bid Item 50 - Abandon Existing Monitoring Well <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid item for abandon existing monitoring well shall be full compensation for <br /> furnishing all labor, materials and other equipment necessary for abandoning the existing <br /> 111 <br /> North Wetmore Stormwater Separation February, 2018 <br /> WO No—UP3659 Division B—BID ITEM DESCRIPTIONS <br /> SP -14 I <br />