My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit price per linear foot for construction of concrete curbs shall be full compensation <br /> for all materials, tools, labor and equipment necessary to construct new curb in place in <br /> accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Crushed surfacing top course placed under curb is incidental to the <br /> curb item. <br /> Bid Item 46 - Concrete Curb and Gutter, Type A-1 <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit price per linear foot for construction of concrete curb and gutter shall be full <br /> compensation for all materials, tools, labor and equipment necessary to construct new curb <br /> and gutter in place in accordance with the Plans, COE Standard Drawings, Standard <br /> Specifications and these Special Provisions. Crushed surfacing top course placed under <br /> curb and gutter is incidental to the curb item. <br /> Bid Item 47 - Asphalt Extruded Curb <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot along the line and slope of the completed curb as <br /> approved by the Inspector. <br /> The unit price per linear foot for construction of curb shall be full compensation for all <br /> materials, tools, labor and equipment necessary to construct new curb and gutter in place I <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Asphalt tack coat placed under curb is incidental to this bid item. <br /> Bid Item 48 - Asphalt Wedge Curb I <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot along the line and slope of the completed curb as <br /> approved by the Inspector. <br /> The <br /> unit price per linear foot for construction of curb shall be fulI CGmNai ioatioi for all <br /> materials, <br /> materials, tools, labor and equipment necessary to construct new curb and gutter in place <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Asphalt tack coat placed under curb is incidental to this bid item. <br /> Bid Item 49 - Replace Chain Link Fence and Gate I <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid item for replace chain link fence and gate shall be full compensation for <br /> furnishing all labor, materials, and other equipment necessary for removal and restoring <br /> and replacing the chain link fence and gate removed by the contractors work in accordance <br /> with Standard Plans and Specifications and these Special Provisions, in locations shown <br /> on the Plans. <br /> Bid Item 50 - Abandon Existing Monitoring Well <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid item for abandon existing monitoring well shall be full compensation for <br /> furnishing all labor, materials and other equipment necessary for abandoning the existing <br /> 111 <br /> North Wetmore Stormwater Separation February, 2018 <br /> WO No—UP3659 Division B—BID ITEM DESCRIPTIONS <br /> SP -14 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.