My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Engineer. No deduction will be made for the weight of asphalt binder, blending sand, <br /> mineral filler, or other component of the mixture. <br /> The unit price for this bid item shall include all labor, materials, equipment and related work <br /> necessary to furnish, machine-place, compact, roll and perform density tests on HMA- CL <br /> 1/2" PG 64-22 overlay pavement including streets, alleys, street crossings, and driveway <br /> aprons as shown on the Plans. <br /> Furnishing and applying tack coat, prime coat, joint seal and crack sealing asphalt is to be <br /> included in this bid item with no direct compensation made. All costs for "Anti Stripping <br /> Additive" and "Compaction Adjustment" shall be included in the unit contract price per ton of <br /> the HMA with no direct compensation made. <br /> Bid Item 42 - Temporary Asphalt Sidewalk and Curb <br /> Measurement and Payment: Unit Price per Square Yard <br /> Measurement for Temporary Asphalt Sidewalk and Curb shall be by the square yard, as <br /> delineated by the contractor and approved by the Inspector. Measurement shall be for <br /> HMA placed in areas shown on the Plans as replacement of sidewalk and curb areas, or as <br /> directed by the Inspector, in accordance with the Standard Specifications and Section 5-04 <br /> of these Special Provisions. <br /> The unit price for this bid item shall include all labor, materials, equipment and related work <br /> necessary to furnish, machine-place, compact, roll and perform any hand work necessary <br /> to meet contract requirements. <br /> All costs for "Anti Stripping Additive" and "Compaction Adjustment" shall be included in the <br /> unit contract price per ton of the HMA with no direct compensation made. <br /> Bid Item 43 - Concrete Sidewalk Restoration <br /> Measurement and Payment: Unit Price per Square Yard. <br /> Measurement shall be per square yard as delineated by the Contractor and approved by <br /> the Inspector prior to removal. <br /> The unit price per square yard for restoration of existing concrete sidewalks shall be full <br /> compensation for all materials, tools, labor and equipment necessary to complete the work <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Crushed surfacing top course placed under sidewalk is incidental to <br /> the sidewalk restoration item. <br /> Bid Item 44 - Concrete Driveway Restoration <br /> Measurement and Payment: Unit Price per Square Yard. <br /> Measurement shall be per square yard as delineated by the Contractor and approved by <br /> the Inspector prior to removal. <br /> The unit price per square yard for restoration of existing concrete driveways shall be full <br /> compensation for all materials, tools, labor and equipment necessary to complete the Work <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications, and these <br /> Special Provisions. Crushed surfacing top course placed under driveway is incidental to <br /> the driveway restoration item. <br /> Bid Item 45 - Concrete Curb, Type E-1 <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> North Wetmore Stormwater Separation February, 2018 <br /> WO No-UP3659 Division B-BID ITEM DESCRIPTIONS <br /> SP -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.