My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> lump sum includes all equipment, materials, labor, installation, and removal, and all other <br /> work required to meet the trench excavation and safety system requirements. <br /> Bid Item 7 - Street Cleaning and Sweeping <br /> Measurement and Payment: Unit Price per Hour <br /> The unit price per hour for Street Cleaning & Sweeping shall be full compensation for all <br /> labor, tools, incidentals, and equipment necessary to provide the street sweeping, cleaning, <br /> and dust control water required for this project. <br /> Measurement for street sweeping and cleaning will be by the hour for the actual time <br /> consumed in pavement sweeping, cleaning and debris removal. No allowance will be <br /> made for time consumed in making repairs to the equipment or for moving the equipment to <br /> or from the site on which the street cleaning is ordered. No separate payment will be made <br /> for water required for dust control and the normal operation of the pickup sweepers. <br /> Bid Item 8 - Erosion/Water Pollution Control <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid item for Erosion/Water Pollution Control, shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary and incidental for the <br /> installation, maintenance and removal of the temporary erosion and sedimentation control <br /> (TESC) facilities to prevent pollution, erosion, siltation, and damage to trenches, <br /> watercourses, or surrounding property and to prevent silt laden waters from entering the <br /> storm drains and sewer system throughout the life of the Contract, in accordance with <br /> Section 8-01 EROSION CONTROL and 2-10 SPECIAL SOIL EXCAVATION AND <br /> BACKFILL REQUIREMENTS. TESC facilities shall include, but not be limited to, any cover <br /> measures, runoff control measures, soil and site stabilization measures, filter fabric fencing <br /> as shown on the Plans, and inlet protection measures for the work area and downstream <br /> areas and any treatment facilities needed to comply with City water quality requirements for <br /> discharging dewatering water into the City sewer system. <br /> The TESC measures shall limit the erosion possibility by covering disturbed soils, <br /> preventing sloughing or raveling of cut and natural slopes, and controlling surface runoff <br /> from flowing into excavations using measures such as curbs, berms, dikes, rock-lined <br /> ditches, and other approved measures. Filter fabric fence shall be used to treat small <br /> areas of non-concentrated runoff prior to discharge from the site. <br /> Bid Item 9 - Sawcut Existing Improvements <br /> Measurement and Payment: Unit Price per Linear Foot <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the saw-cutting of asphalt or concrete materials, or a <br /> combination of asphalt and concrete, regardless of depth or location of either material, shall <br /> be full compensation for all labor, material, tools, and equipment necessary to satisfactorily <br /> complete the Work as specified in Section 2-02.3(3) of the Standard Specifications, these <br /> Special Provisions and as shown on the Plans. The unit price per lineal foot for saw-cutting <br /> includes, but is not limited to, the saw-cutting necessary for the final joint between existing <br /> pavement and permanent HMA pavement. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. Any necessary re-cutting due to <br /> damage during excavation will not be remeasured for payment. <br /> North Wetmore Stormwater Separation February, 2018 <br /> WO No—UP3659 Division B—BID ITEM DESCRIPTIONS <br /> SP-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.