My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid Item 10 - Removal of Asphalt Pavement <br /> Measurement and Payment: Unit Price per Square Foot I <br /> Measurement for removal of asphalt pavement will be per square foot excavated along the <br /> neatlines shown in the plans and described in the specifications, as approved by the <br /> Inspector. I <br /> The unit price per square foot for removal of asphalt pavement, regardless of thickness, <br /> shall be full compensation for all labor, material, tools, and equipment necessary to <br /> satisfactorily complete the Work as specified in Section 2-02.3(3) of the Special Provisions, 111 <br /> as shown on the Plans, or as directed by the Engineer. The unit price for removal includes <br /> hauling and disposing of materials at a city-approved disposal site. <br /> Bid Item 11 - Removal of Concrete Pavement � <br /> Measurement and Payment: Unit Price per Square Foot <br /> Measurement for removal of concrete pavement will be per square foot excavated beneath <br /> asphalt pavement, along the neatlines shown in the plans and described in the <br /> specifications, as approved by the Inspector. <br /> The unit price per square foot for removal of concrete pavement, regardless of the depth or 111 <br /> thickness, shall be full compensation for all labor, material, tools, and equipment necessary <br /> to satisfactorily complete the Work as specified in Section 2-02.3(3) of the Special <br /> Provisions, as shown on the Plans, or as directed by the Engineer. The unit price for <br /> removal includes hauling and disposing of materials at a city-approved disposal site. <br /> Bid Item 12 - Removal of Concrete Sidewalk <br /> Measurement and Payment: Unit Price per Square Foot M <br /> Measurement for removal of concrete sidewalk will be per square foot along the neatlines <br /> shown in the plans and described in the specifications, as approved by the Inspector. <br /> The unit price per square foot for removal of concrete sidewalk, regardless of thickness, <br /> shall be full compensation for all labor, material, tools, and equipment necessary to <br /> satisfactorily complete the Work as specified in Section 2-02.3(3) of the Special Provisions, <br /> as shown on the Plans, or as directed by the Engineer. The unit price for removal includes <br /> hauling and disposing of materials at a city-approved disposal site. <br /> Bid Item 13 - Removal of Curb, Curb and Gutter <br /> Measurement and Payment: Unit Price per Lineal Foot <br /> Measurement for removal of curb or curb and gutter will be per lineal foot along the <br /> neatlines shown in the plans and described in the specifications, as approved by the <br /> Inspector. <br /> The unit price per lineal foot for removal of curb, curb and gutter, regardless of thickness, <br /> shall be full compensation for all labor, material, tools, and equipment necessary to <br /> satisfactorily complete the Work as specified in Section 2-02.3(3) of the Special Provisions, <br /> as shown on the Plans, or as directed by the Engineer. The unit price for removal includes <br /> hauling and disposing of materials at a city-approved disposal site. I <br /> Bid Item 14 - Crushed Surfacing Base Course <br /> Measurement and Payment: Unit Price per Ton <br /> Measurement for crushed surfacing base course will be by the ton as recorded on certified <br /> weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, I <br /> North Wetmore Stormwater Separation February, 2018 <br /> WO No—UP3659 Division B—BID ITEM DESCRIPTIONS <br /> SP-6 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.