FABER CONSTRUCTION 4/8/2018 Change Order 1
>
Contracts
>
Capital Contract
>
FABER CONSTRUCTION 4/8/2018 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
5/4/2018 9:05:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
FABER CONSTRUCTION
Approval Date
4/8/2018
Department
Public Works
Department Project Manager
DAVE VOIGT
Subject / Project Title
SEWER REGULATORS R4 & R39 MODIFICATIONS
Public Works WO Number
UP3633
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000808
Total Compensation
$60,149.47
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction 8/14/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Sewer Regulators R4 &R39 Modifications <br /> Change Order No.1 <br /> Change Order Effective Date: February 26, 2018 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts, Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of,or related to,this <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation,delay, impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest,dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute,claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> i . <br /> Ate-- <br /> Mayor City Cler G /0 City Attorney <br /> Date: Date: /0 • 1h(/ <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> ./1 /L,1 /. '�7 !I, • <br /> �� 121 <br /> � i <br /> Date: 3/z ppg II ate: g AMY <br /> ate: Date: <br /> Page 2 of 6 <br />