My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FABER CONSTRUCTION 4/8/2018 Change Order 1
>
Contracts
>
Capital Contract
>
FABER CONSTRUCTION 4/8/2018 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
5/4/2018 9:05:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
FABER CONSTRUCTION
Approval Date
4/8/2018
Department
Public Works
Department Project Manager
DAVE VOIGT
Subject / Project Title
SEWER REGULATORS R4 & R39 MODIFICATIONS
Public Works WO Number
UP3633
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000808
Total Compensation
$60,149.47
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction 8/14/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Sewer Regulators R4 & R39 Modifications <br /> Change Order No.1 <br /> Change Order Effective Date: February 26, 2018 <br /> CONTRACTOR <br /> ByAIN /17 <br /> (r 4- i fM Date: 5 - 21 - 2o(g <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> This change order adds four(4) new items to the contract and modifies seven (7) existing bid items of <br /> the contract as follows: <br /> New items being added to the Contract by change order#1: <br /> Item#36—Landscaping & Irrigation Restoration. Create new item#36, titled"Landscaping and <br /> Irrigation Restoration", for work involved in the restoration of landscaping and irrigation systems, for <br /> which costs will be tracked via the force account method. Add an anticipated cost of$43,000.00 to the <br /> contract for this new item#36. <br /> Item#37-Removal of Structures and Obstructions Revised. Create new item#37 titled"Revised <br /> Removal of Structures and Obstructions" in the new lump sum amount of$24,951.31,resulting in a <br /> $24,951.31 contract price increase. <br /> Item#38—Revised Sheeting, Shoring, Bracing and Noise Wall Protection at R4 Site. Create new <br /> item#38 titled"Revised Sheeting, Shoring, Bracing and Noise Wall Protection at R4 Site"in the new <br /> lump sum amount of$96,105.07, resulting in a $96,105.07 contract price increase. <br /> Item#39—Revised Temporary Sewer Flow Bypassing at R4 site. Create new item#39 titled <br /> "Revised Temporary Sewer Flow Bypassing @ R4 Site" in the new lump sum amount of$44,449.81, <br /> resulting in a$44,449.81 contract price increase. <br /> The above four(4)new items result in a contract price increase of$208,506.19. <br /> Existing bid Items being deleted or modified by change order#1 are as follows: <br /> Bid Item #7—Removal of Structures and Obstructions. Delete this lump sum bid item from the <br /> contract in the amount of$28,952.55, resulting in a ($28,952.55) contract price decrease. <br /> Bid Item#9— Sheeting, Shoring, Bracing and Noise Wall Protection at R4 Site. Delete this lump <br /> sum bid item from the contract in the amount of$101,110.02, resulting in a ($101,110.02) contract <br /> price decrease. <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.