Laserfiche WebLink
Project: Sewer Regulators R4&R39 Modifications <br /> Change Order No.1 <br /> Change Order Effective Date: February 26, 2018 <br /> Bid Item #35—Force Account. The dollars spent on this bid item covered several unforeseen <br /> situations and/or for additional unanticipated work, as directed by the Engineer. Also this item paid for <br /> modifications to the existing regulator structure, (as previously described above at the top of page 3 of <br /> this change order). The net result of the additional work directed by the Engineer and completed by the <br /> Contractor resulted in the need to appropriate an additional $30,000.00 to the previous allotted amount <br /> of$75,000.00, for a revised total amount of$105,000.00. <br /> CONTRACT TIME: No additional contract working days are anticipated by change order#1. <br /> Page 6 of 6 <br />