T BAILEY INC 4/8/2018 Change Order 1
>
Contracts
>
Capital Contract
>
T BAILEY INC 4/8/2018 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:51 AM
Creation date
5/4/2018 9:12:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T BAILEY INC
Approval Date
4/8/2018
Department
Public Works
Department Project Manager
RICHARD HEFTI
Subject / Project Title
WFP EAST CLEARWELL ROOF REPLACEMENT
Public Works WO Number
UP3662
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000873
Total Compensation
$78,745.73
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T Bailey Inc 9/28/2017
(Amendment)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: WFP East Clearwell Roof Replacement <br /> Change Order No.01 <br /> Change Order Effective Date: 3/15/18 <br /> CONTRACTOR <br /> By Date: '415) i <br /> 0,y'i Ask.,Officer <br /> 12ft1G1 1 <br /> Exhibit A - Description of Changed Work <br /> Work Change Directive —No. 001 Investigate Possible Void Under Floor Slab: <br /> WCD-001 is a lump sum amount revision of$4,480.00. WCD-001 did not add any <br /> calendar days. <br /> Justification: Prior to the start of construction, the City's consultant performed an <br /> examination of the East Clearwell using ground penetrating radar. The ground <br /> penetrating radar identified a possible void under the floor slab in an area where past <br /> settlement of the clearwell wall had occurred. The City had our design-build contractor <br /> core a hole through the slab in the area of the possible void. The foundation material <br /> under the slab was probed to check for a void and to confirm the material was <br /> consolidated. <br /> WCD-001 covers the additional costs to core the hole and repair the hole using <br /> reinforcing steel and placing new concrete in hole. <br /> Work Change Directive — No. 002: Install Handrail on the North Bridge <br /> Abutment: WCD-002 is a lump sum revision for $3,750.00. WCD-002 did not add any <br /> calendar days. <br /> Justification: The project scope included the removal and replacement of the bridge <br /> between the south dam and the Screen House intake structure. The old bridge and <br /> abutment were 20-feet wide. The new bridge is 6-feet wide. This left 14-feet of fall <br /> exposure along the existing abutment. The added handrail will protect personnel from <br /> possible falls. <br /> WCD-002 covers the additional costs to fabricate, galvanize and install the handrail. <br /> Work Change Directive — No. 003 — Revise Floor Repair Area: WCD —No. 003 is a <br /> lump sum revision for $59,468.07 and the addition of 10-calandar days. <br /> WFP East Clearwell Roof Replacement March 15, 2018 <br /> WO#UP3662 006363 - 3 <br />