My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T BAILEY INC 4/8/2018 Change Order 1
>
Contracts
>
Capital Contract
>
T BAILEY INC 4/8/2018 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:51 AM
Creation date
5/4/2018 9:12:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T BAILEY INC
Approval Date
4/8/2018
Department
Public Works
Department Project Manager
RICHARD HEFTI
Subject / Project Title
WFP EAST CLEARWELL ROOF REPLACEMENT
Public Works WO Number
UP3662
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000873
Total Compensation
$78,745.73
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T Bailey Inc 9/28/2017
(Amendment)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: WFP East Clearwell Roof Replacement <br /> Change Order No.01 <br /> Change Order Effective Date: 3/15/18 <br /> WCD-005 covers the additional costs to install a new suction pipe for the recovered <br /> water sample pump. <br /> Work Change Directive—No. 006: Revise the Size of the Equipment Hatch to 72" x <br /> 150". Revise the Access Door from a Double Leaf Access to a Roll-Off Access. <br /> WCD-006 is a lump sum revision of$2,944.00. WCD-006 did not add any calendar <br /> days. <br /> Justification: WFP personnel place an aluminum boat into the East Clearwell for <br /> maintenance and inspections. The existing boat would not fit through the hatch size <br /> called out in the contract's supplementary conditions. Enlarging the hatch allows the <br /> existing boat to fit through the hatch. Because of the larger hatch, the per contract <br /> double leaf access would be difficult to open. Revising the double leaf to a roll-off <br /> access door will make the door easier and safer to operate. <br /> WCD-006 covers the costs of the additional engineering, materials and installation costs <br /> of the larger hatch. <br /> Contract Time: <br /> Ten, (10) Calendar Days are being added to the contract by change order #1. <br /> END DOCUMENT 006363 <br /> WFP East Clearwell Roof Replacement March 15, 2018 <br /> WO#UP3662 006363 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.