Laserfiche WebLink
Project: 41' St to WMVD Freight Corridor Improvements <br /> Change Order No.3 <br /> Change Order Effective Date: January 22, 2018 <br /> CITY <br /> Attest: Approved As to Form: <br /> doWill:dor10 <br /> Mayor City Clerk City Attorney <br /> Date: Date: 10 3l..2_3/ d <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> Z‘;46120--- <br /> agjti(ii4eL <br /> Date: 3/WS Dat : W i D e: 3-6 -2018 Date: 3l4,((4 <br /> CONTRACTOR <br /> B� Date: 2 /27/18 <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> This Change Order# 3 deletes one (1) existing bid item, adds one (1) new item, and adds fifty-one (51) <br /> working days to the Contract Time as follows: <br /> Deleted Bid Item <br /> Bid Item #2—Removal of Structure and Obstruction. Delete existing bid item# 2 entitled, <br /> "Removal of Structure and Obstruction"at the Contract lump sum price of$17,000.00, by removing <br /> $17,000 from the Contract, resulting in a$17,000.00 decrease to the Contract price. <br /> Added Bid Items <br /> Item #81 —Revised Removal of Structure and Obstruction. Add new item# 81 entitled, "Revised <br /> Removal of Structure and Obstruction" at the agreed to lump sum price of$15,300.00, by adding item <br /> # 81-Revised Removal of Structure and Obstruction to the Contract, resulting in a$15,300.00 increase <br /> to the Contract price. <br /> Page 3 of 4 <br />