MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
>
Contracts
>
Capital Contract
>
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:22 AM
Creation date
5/4/2018 9:23:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
MARSHBANK CONSTRUCTION
Approval Date
3/26/2018
Council Approval Date
3/21/2018
Department
Public Works
Department Project Manager
Grace Kane
Subject / Project Title
41st to W Marine View Dr Freight Corridor Imp
Public Works WO Number
PW3472
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0000049
Total Compensation
-$1,700.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 5/9/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: 41' St to WMVD Freight Corridor Improvements <br /> Change Order No.3 <br /> Change Order Effective Date: January 22, 2018 <br /> The net result of adding new item# 81 and deleting existing bid item#2 is a$1,700.00 decrease to the <br /> Contract price. <br /> Justification <br /> Bid Item #2—Removal of Structure and Obstruction. This bid item is being deleted because <br /> removal work at 41' St and Rucker was deleted from the Contract. <br /> Item#81 —Revised Removal of Structure and Obstruction. The Contract plans required that <br /> drainage structures and piping be removed at the intersection of 41' St and Rucker, but that work was <br /> deleted from the Contract. This new item is being added to account for the costs to pay for removals as <br /> shown on the plans and in the specifications as part of removals of structure and obstruction. <br /> Change Order # 3 Total Cost: ($1,700.00) <br /> Contract Time: Fifty-one (51)working days are added to the Contract Time in Change Order <br /> #3 as detailed below. <br /> A. Forty(40) Working Days are added to the Contract Time to account for the Equitable <br /> Adjustment to Contract for Utility Delays. <br /> B. Two (2) Working Days are added to the Contract Time to account for time to rebuild roadway <br /> with crushed rock and hot mix asphalt. <br /> C. Seven(7) Working Days are added to the Contract Time to account for additional days of road <br /> preparation and paving that were not part of original Contract. <br /> D. Two (2) Working Days are added to the Contract Time to account for additional roadway <br /> surveying, due to revisions to Contract plans. <br /> Page 4 of 4 <br />