Laserfiche WebLink
�EGE�1D <br /> MATGH LINE SEE DWG 40-23-1 M13 <br /> 7 14'-0" _ 50'-0" A COMPRESSED AIR <br /> SEE TNM113 FOR <br /> CONTINUATION � COMPRESSED AIR, STANDARD DUPLEX AIR DROP, 1/2" <br /> T7 _ _ T _ T -� _ T _ G HOSE WITH (2)-1/4" QD SOCKETS. SEE DWG. <br /> — —— H --�— - . <br /> A A ' A � A 40-23—M513 (DETAIL12). <br /> 4 <br /> 3 6" CA MAI N � �-�—� <br /> COMPRESSED AIR, STANDARD DUPLEX AIR DROP, 1 2" <br /> 2" CA TEE CONNECTION WITH 3 6" CA MAIN SEE 1 M 119 �OR HARD PIPE WITH 2 -1 4" QD SOCKETS. SEE DWG/ <br /> _ �-+ _ H _ _ � ISOLATION VALVE, FOR SERVICE ( ) / <br /> TO TOOLING POSITION, TYP. � 6" CA MAIN DOWN CONTINUATION 40-23—M513 (DETAIL 11). . <br /> O � TO UTILITY TRENCH <br /> -�- POINT OF CONNECTION <br /> GENERA� f� OTES <br /> n� 1 . INSTALLATION AND DESIGN OF AIR SYSTEMS SHALL <br /> $, BE IN ACCORDANCE WITH SPECIFICATIONS AND PLUMBWG <br /> DRAWINGS. REUSE PIPING & FITTINGS WHEN POSSIBLE. <br /> 1 „ . <br /> 1 " 2. SUPPORT ALL PIPING PER UNIFORM PLUMBING CODES <br /> a IN AREAS NOT SPECIFIED. <br /> 1 -1/4" 3. SALVAGE AND REUSE EXISTING COMPRESSED AIR FITTINGS <br /> y AND SPECIALTY ITEMS, QUICK DISCONNECTS, FILTERS, <br /> � A „ LUBRICATORS, FLOW SENSORS, ECT... <br /> 1 . <br /> 4. ALL COMPRESSED AIR PIPING ROUTED ALONG FACTORY <br /> � FLOOR SHALL BE COVERED WITH MASTIC FOR SAFETY. <br /> SEE DETAIL DWGS. PAINT MASTIC PIPE COVERING SAFETY <br /> - 1/4" Q.D. YELLOW. <br /> X <br /> n� A �� �� ��2» MASTIC FORMULA: <br /> 1 " � 1 PART TENNIS COURT BINDER (TCB). <br /> � �� 1 PART FAST-SET POWDER CONCENTRATE (CEMENT). <br /> � 2- 1 /2 PARTS #1 SAND. <br /> x �--� " 1 -1/4" OR WHEN USING POWDER CONCENTRATE/SAND MIX: <br /> -��`- A 1/2" Q.D. � 1 5 GAL BUCKET TENNIS COURT BINDER (TCB). . <br /> c>� �--1 " v@ ev 1 M118 M513 3 60# SACKS FAST-SET POWDER CONCENTRATE/SAND <br /> �` (TYP.4) MIXTURE (MORTAR). <br /> � o ��2�, <br /> � <br /> � � � ., <br /> � a � " � �/2�� � � AIR MANIFOLD WITH THE FOLLOWING: � <br /> "' (4)-1/4" QD SOCKETS <br /> i <br /> " (1)-1�2„ QD SOCKET <br /> o +� �� � 1/4" Q,D. 1 -1 4" (1)_3/4" QD SOCKET WITH DIXON SCVH6 <br /> w 1 q --�# � / � (1) 1 QD SOCKET WITH DIXON SCVH8 <br /> � I � ,� � ��2 1/2 Q.D. � „ 1/2 � . <br /> z ,� �. � /2 SEE AIR QD DETAIL 1 M 1 1 8 M 5 1 0 <br /> J ���� — � <br /> �.�. @ � A— <br /> � � „�P ��2„ <br /> � 1 "AIR IN � » A �e �v -e� 1-1/4" � _ „ CO �ISTRUCTIO �J f� OTES <br /> 14'-0" TUNNEL � <br /> �_ I_ , „ <br /> � ROUTE MAIN AT 10 -0 AFF. <br /> rn <br /> a 1 -1/4" � � SUPPORT VERTICAL PIPING FROM COLUMN AT <br /> » <br /> 1 �, ' <br /> e� N <br /> � A 1 1 " 1 " „ 1 " „ 1 " 1 -1/4" � 1-1/4" � 1 -1/4" � � ROUTE BRANCH PIPE AT 18' AFF FOR <br /> CONNECTION TO UTILITY BRIDGE. <br /> A � » �H� � � � � � � � �' <br /> � <br /> � 4 P R O V I D E B L I N D F L A N G E F O R F U T U R E <br /> � 1 'AIR UP TO 2ND DECK w � CONNECTION. <br /> 1 v� <br /> { OOL 6FME 65BOOOQ2) w <br /> z 5. PROVIDE (4) PORTABLE EYE WASH STATIONS <br /> J (FEND-ALL PURE FLOW 1000) FOR EACH OF <br /> ° � THE (4) WING CELLS. LOCATIONS SHALL BE <br /> � DETERMINED BY OWNER. <br /> O 1 3 5 7 9 11 <br /> C� 9 2 4 6 8 10 11 ' <br /> F' <br /> 1M110 � _1M111 _J 1M112 � 1M113 � 1M114 � <br /> � � � <br /> 1M115 i 1M116 i 1M117 1M118 1M119 <br /> ------+--------�------ ----- <br /> 1 M120 I 1 M121 I 1 M122 I 1 M123 I 1 M124 <br /> -- � ------- �------ �--------� -- - ���� <br /> 1M125 T 1M126 ' 1M127� 1M128 '-1M129 H <br /> L'./ <br /> � KEY PLAN BLDG. 40-23 � <br /> SCALE: NONE ��� <br /> 8' 4' 0 4' 8' 16' <br /> SCALE: 1/8"=1 '-0" <br /> �• DANFp <br /> ��-��P��°f w��,'��'�� <br /> MATCH LINE DWG 40-23-1 M23 0 � <br /> � <br /> www.brph.com Copyrighto 2015 <br /> FI R ST FL00 R P LA�I � FSi consulting engineers 2 0 2 9 a e- <br /> Seattle, Washin ton �,� �F��STER�� ���`` Architects, Engineers, Constructors <br /> � PROFESSIONAL STAMP & SIGNATURE g �SS�ONAL ENG 19020 33rd Ave W,Suite 530 Lynnwood Office <br /> SCALE: 1/8 =1 APPLIES TO WORK WITHIN THE CLOUDED Lynnwood,Washington,98036 <br /> REVISION AREAS ONLY AS INDICATED Solutions 8c Service �2��6,,5 Main#425-255-1095 <br /> SICNSD <br /> SYM REVISION BY APPROVED DATE 5YM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> ACCEPTABILITY wHe 12 16 15 PARTIAL FIRST FLOOR PLUMBING PLAN / / <br /> 0 Issue For Construstion REG RED 12/16/i5 THIS DESIGN AND/OR �< 16123 12 16 15 <br /> SPECIFICATION IS APPROVED MSS 12 16 15 SHEET <br /> TITLE FACTORY TRANSFORMATION 40-23 WING LRIP <br /> APPROVEp BY DEPT. DATE REG ,2 ,6 ,5 1 M 118 <br /> �0�,�� CHECKED <br /> REo 12/16 15 BUILDING 40 23 <br /> APPROVED � JOB N0. COMP N0. <br /> WD 15/2899-200 <br /> APPROVED MECHANICAL MASTER COL. G-7/G-9 EVERETT, Wq °wc No. 40-23-1 M118 <br />