Laserfiche WebLink
G E f� ERA� N OTES <br /> 1 . INSTALLATION AND DESIGN OF AIR SYSTEMS SHALL BE IN <br /> � � O . 1 � 1 1� ACCORDANCE WITH SPECIFICATIONS AND PLUMBING DRAWINGS. <br /> I I I 2, SUPPORT ALL PIPING PER UNIFORM PLUMBING CODES IN <br /> AREAS NOT SPECIFIED. <br /> — � _ � — — __ — _ T i __ — — 1 _ _ r1 G 3. SALVAGE AND REUSE EXISTING COMPRESSED AIR FITfINGS AND <br /> SPECIACTY ITEMS, QUICK DISCONECTS, FILTERS, LUBRICATORS, <br /> A A A A A � 3 � FLOW SENSORS, ECT... <br /> ��- � 2" CA TEE CONNECTION 6" CA MAW � <br /> SEE 1M118 F�R 2 2 <br /> CONTINUATION 6" CA MAIN WITH ISOLATION VALVE, 4. ALL COMPRESSED AIR PIPING ROUTED ALONG FACTORY FLOOR <br /> FOR SERVICE TO TOOLING SHALL BE COVERED WITH MASTIC FOR SAFTEY. SEE DETAIL <br /> POSITION, TYP. � DWGS. PAINT MASTIC PIPE COVERING SAFETY YELLOW. <br /> MASTIC FORMULA: <br /> 1 PART TENNIS COURT BINDER (TCB). <br /> O 1 PART FAST-SET POWDER CONCENTRATE (CEMENT). 2-1/2 <br /> PARTS #1 SAND. <br /> OR WHEN USING POWDER CONCENTRATE/SAND MIX: 1 5GAL <br /> BUCKET TENNIS COURT BINDER (TCB). <br /> 3 60# SACKS FAST-SET POWDER CONCENTRATE/SAND <br /> MIXTURE (MORTER). <br /> D <br /> 5. ROUTE COMPRESSED AIR PIPING WITH PIPE COVERING MASTIC <br /> 2 FEET FROM LEAD(NG EDGE OF HORIZONTAL STABILIZER. USE <br /> TOOLING OUTLINE MARKINGS ON FLOOR FOR REFERENCE <br /> � STANDARD DUPLEX AIR DROP, HARD PIPED, <br /> 2�� X WITH (2)-1/4" QD SOCKETS <br /> _, <br /> x x- x x-- x— �x— x x--�— <br /> � � AIR MANIFOLD WITH THE FOLLOWING: <br /> � _ » <br /> 1 1 /4" 2°� 6 � (4) 1/4 QD SOCKETS <br /> � <br /> � � � � 1 M 119 M532 (1 )-1/2" QD SOCKET <br /> -� (1)-3/4" QD SOCKET WITH DIXON SCVH6 <br /> =� (1)-1 ° QD SOCKET WITH DIXON SCVH8 <br /> 1 1 /2" <br /> 1/2"A SEE AIR QD DETAIL � <br /> x 1M119 M510 <br /> 6. INSTALLATION OF COMPRESSED AIR SYSTEM SHALL BE IN <br /> � I ACCORDANCE WITH FACILITIES MECHANICAL STANDARD <br /> » (E)1"A D38106-20 USING THE FOLLOWING EVERETf SITE SPECIFIC <br /> n <br /> A D 2 PREFERENCES. <br /> � � <br /> d- D d- � � �4�� � <br /> PIPE MATERIALS: <br /> 2 INCH AND UNDER, THREADED BLACK SEAMLESS CARBON <br /> � � 1 1 /4" --�--x x x —x--x x —x —x x— ;< -x x x —x—,— x x x —x x x- x x- -x x— STEEL, ASTM A53, GRADE B, SCHEDULE 40 PIPE. <br /> � `- 2-1/2 AND ABOVE, ELECTRIC-RESISTNACE WELDED BLACK <br /> � �- � CARBON STEEL, ASTM A53, GRADE B, STANDARD WEIGHT. <br /> � <br /> � <br /> � FITTINGS: <br /> r- <br /> » 2 INCH AND UNDER: CLASS 150 THREADED BLACK ASTM <br /> N �. T 1 1 2 A_� � 1197 MALLEABLE IRON, ASME/ANSI B16.3. <br /> � � 2-1/2 AND ABOVE: WROUGHT CARBON STEEL, BUTT <br /> � ' 1 1 /4" WELDING, SEAMLESS, ASTM A234, GRADE WPB AND ANS) <br /> `r 2" B16.9, SAME WALL THICKNESS AS PIPE. FORGED CARBON <br /> � D STEEL WELDOLETS, SCHEDULE TO MATCH RUN AND BRANCH, <br /> � � A105, �NSI g�6 gCED, SLIP-ON OR WELD NECK, ASTM <br /> �w ' � v �' � e 1 1 /2„ A <br /> � U P TO STA.61 VALVES: <br /> w �. 2 INCH AND UNDER: THREADED BRASS BALL VALVES WITH <br /> z � , 1 /2"(N EW) N� LARGER SSH ALL LBENFULL APORT DESIGN WOG. 3/4 INCH OR <br /> � D 1 2" NEW a \ � 2-1/2 AND ABOVE: BUTTERFLY TYPE, WAFER OR LUG DESIGN, <br /> Q � � � � BODY OF CAST IRON PER ASTM A126 CLASS B OR DUCTILE <br /> � IRON PER SPEC ASTM A536 OR A395, STAINLESS STEEL <br /> , 1 /2" A „ 1 1 /2" 1A 1 /2" v v 1A 1 /2" � STEM, BRONZE OR DUCTILE IRON DISC, EPT OR EPDM LINER, <br /> 1 1 /2 � e e GEAR OPERATOR 8 INCHES OR IARGER. RATER FOR 150 PSIG <br /> ^ ^ � � C 0 N STR U CTI 0 N f� OTES MINIMUM AT 250 DEGREES FAHRENHEIT. <br /> @ @ A @ <br /> 1 2 <br /> 1 2 � <br /> `� 7. TESTING OF NEW COMPRESSED AIR PIPING SHALL USE <br /> 1�- ROUTE MAIN AT 10'-0" AFF. COMPRESSED AIR OR NITROGEN �150 PSIG FOR 1 HOUR. <br /> THERE SHOULD BE NO LOSS IN PRESSURE. CHECK EACH <br /> � ROUTE BRANCH PIPE AT 18' AFF FOR JOINT WITH SOAPY WATER FOR LEAKS. <br /> CONNECTION TO UTILITY BRIDGE. <br /> 3�j PROVIDE BLIND FLANGE FOR FUTURE <br /> CONNECTION. <br /> 4. PROVIDE (4) PORTABLE EYE WASH 1 3 5 7 9 11 <br /> STATIONS (FEND-ALL PURE FLOW 1000) .g 2 4 6 8 10 11 ' <br /> FOR EACH OF THE (4) WING CELLS. <br /> LOCATIONS SHALL BE DETERMINED BY , ' <br /> I � OWNER. 1M110 � 1M111 � 1M114 � <br /> 1M113 � <br /> -----i-------i 1 M 112 f- ------' <br /> O 1M115 i 1M116 i 1M117 � 1M118 1M119 <br /> -----i-------�------i--------I �p <br /> 1M120 ; 1M121 ; 1M122 ; 1M123 ; 1M124 <br /> -- � -------�------ �--------� -- - � <br /> 1M125 � 1M126 ' 1M127—' 1M128 �1M129 H <br /> ( � <br /> KEY PLAN BLDG. 40-23 ,� <br /> SCALE: NONE �� <br /> 8' 4' 0 4' 8' \ 16' <br /> SCALE: 1/8"=1'-0" <br /> �• �ANFp <br /> 0 5 �� �`�� �� �� <br /> �v ��P ' �'�$ <br /> MATCH LINE SEE DWG 40-23-1 M124 m <br /> 0 <br /> � <br /> FI RST FL00 R P LAN � � FSi consulting engineers 2 o Z 9 0 � w`NW•brph.com Copyrighto2015 <br /> I Seattle, Washin ton �,� �F��STER`�� ���`` Architects, Engineers, Constructors <br /> SCALE: 1/8"=1 ' I V PROFESSIONAL STAMP & SIGNATURE g �SS�ONAL ENG 1902033rdAve W,Suite 530 Lynnwood Office <br /> APPLIES TO WORK WITHIN THE CLOUDED Lynnwood,Washington,98036 <br /> REVISION AREAS ONLY AS INDICATED Solutions 8c Service �z��6,,5 Main#425-255-1095 <br /> SIGXBD <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN OAT SUBTITLE CURRENT REVISION SYMBOL DATE <br /> 0 Issue For Construstion REG RED 12 16 15 H SCDESGN B D/R WH B K D 12 16 15 PARTIAL FIRST FLOOR PLUMBING PLAN / / <br /> 16123 12 16 15 <br /> � � SPECIFICATION IS APPROVED MSS 12 16 15 sH�ET <br /> BOE,��� TITLE FACTORY TRANSFORMATION 40-23 WING LRIP 1 M 119 <br /> APPROVED BY DEPI'. DATE REG 12 16 15 <br /> CHECKED <br /> RED 12 16 15 BUILDING 40'�� <br /> APPROVED JOB N0. COMP N0. <br /> WD 15/2899-200 <br /> A R v ° MECHANICAL MASTER COL. G-Gp/9-11 EVERETf, Wq owc No. 40-23-1 M119 <br />