Laserfiche WebLink
MATCHLINE - SEE DWG 45-YD-C220-11 <br /> --�--�--- -- -- -- -- — -- -- -- -- o o -- — — — — — — -- — LE� E D <br /> � � O � <br /> X � � o $ o 0 0 0 ❑ - -, <br /> I � I CONCRETE (REINFORCED AND NON <br /> 19 ° <br /> � o I o o � _ � REINFORCED) PAVEMENT REMOVAL <br /> I � � � <br /> • e � M <br /> X , ° I ° o � GENERAL NOTES <br /> o � 1. PROTECT ALL EXISTING SURFACE FEATURES TO <br /> I I � REMAIN, INCLUDING BUT NOT LIMITED TO <br /> � '� ° � STRIPING, VALVE BOXES, FIRE HYDRANTS AND <br /> 0 <br /> � I SPRAY NOZZLES, HAND HOLES, LIGHT POLES, <br /> x I I MANHOLES/INLETS, UTILITY BOXES, TIE DOWNS, <br /> AND EQUIPMENT PRIOR TO WORK. <br /> � I I � 2. EXISTING UNDERGROUND UTILITY FEATURES SHOWN <br /> � '� � 4J-Z�3 45-287 � � ON PLANS AND PROFILES ARE BASED ON SURVEY <br /> � I ° DATA, GPR SURVEY, AND RECORD DRAWINGS AND <br /> x I I TME OF PLANSAPR DUCTIONFORMHE��ONTRACTOR <br /> --i 45-247 I SHALL FIELD LOCATE ALL UTILITIES PRIOR TO THE <br /> �� � <br /> START OF DEMOLITION WORK. <br /> � � � 3. SOIL REMEDIATION MAY BE REQUIRED. CONTACT <br /> � C� 4'�-223 � ° BOEING EHS, AL SUGINO PRIOR TO EXCAVATION <br /> I I o o ° � OF SUBGRADE. <br /> � � �~-1 I ( 0 4. COORDINATE ALL UTILIIY SHUT DOWNS WITH <br /> ° ° o BOEING FACILITIES PRIOR TO EXCAVATION. <br /> � � Q � I <br /> � X o B I —X X X X X X X }� o � o 00 <br /> �- X- X "' � o � 000 00 � <br /> � ° 45-28 � � 6 a <br /> _ � � <br /> 0 4� 249 I <br /> �\ \ <br /> x � CO �JSTRU �TION NOTES <br /> o � I �' <br /> I 1� CONCRETE PANEL REMOVAL NOTES: <br /> � x I I x � A. CONCRETE PANELS TO BE REMOVED SHALL BE <br /> � ° I CUT FULL DEPTH. <br /> � ° o0 oQ <br /> X X � B EMOVED ROMPAIDJACENTKSLABS,��SAWCUTfING <br /> I <br /> SHALL NOT PENEfRATE ADJACENT SLABS TO <br /> � � I � X I REMAIN. <br /> � X � C. PAVEMENT REMOVAL AREAS SURROUNDED BY <br /> ° � I .� �► .� ,a. ,� ,�► .� ,,. .� ,b, ,� ,,, ,� <br /> � � � 'b i PAVEMENT TO REMAIN BY WHAT EVER MEANS <br /> N X � I � � � NECESSARY, WHICH MAY INCLUDE: <br /> N 21 � o N <br /> � I � � a � � o PPROX MATELY 1�25 NCHES INS DE THE PANE <br /> � I � ° ° �� <br /> � �X o � X � TO BE REMOVED. FOLLOWED BY A SECOND <br /> � CUT ALONG THE JOINT AFTER BREAKING, <br /> `� 4 "rJ-231 4 'rJ-533 l� c� CHIPPING AND REMOVING THE INTERIOR <br /> o '� � I � CONCRETE. <br /> � x <br /> W I o 0 0 o w -LIFT-OUT METHOD. CUT A SINGLEFULL DEPTH <br /> �'�X � ° ° "' SAW CUT FOLLOWED BY THE PLACEMENT OF <br /> � � I x � � � SECURE LIFTING ANCHORS TO LIFT THE PANE <br /> o l <br /> Z � o z SECTION OUT. <br /> � ( 4 _'�?�� o o � o 0 0 0 0 og a X � -OTHER APPROVED REMOVAL METHODS. <br /> Q O ° I � g `� a D. A N Y S T R I P I N G A N D B O L L A R D R E M O V A L I S <br /> �I � _ _ I � X X X X X X X X <br /> J � x. ,� ,� ,x �,, ,� � INCIDENTAL TO CONCRETE PANEL REMOVAL. <br /> 45 204 <br /> b< °� o �� �O� �� I �— X 2 SEE MECHANICAL AND ELECTRICAL PLANS FOR <br /> � �' <br /> � o I REMOVAL OF FWD HARDSTAND AND UTILITY <br /> I I INTERRUPTIONS. <br /> fa <br /> I o <br /> � I 2 � � � 3,� PROTECT WATER VALVE TO REMAIN OPERATIONAL <br /> 0 21 I DURING CONSTRUCTION. <br /> � o � o� <br /> � <br /> � <br /> � <br /> � ; °c�; � I <br /> ► � I <br /> i i � ° I m � <br /> k , � I , B <br /> � ; 1 <br /> i � o , <br /> � . . <br /> . . . <br /> 2 2 � ' � � : � <br /> p , o . . <br /> � . � ► � <br /> � p <br /> � � e , ( O <br /> � i o O e e <br /> � I � 00 01 <br /> j � o ° � O � I. , � ._ r,_ <br /> � r I o C� 02 � e 03J '04����= 'i 05 <br /> 1 � ° o o f ° � � ° � l <br /> + + 0 � I ' ^ ( eo o. 4 � , <br /> � t I o � �.� � O6 � 07= - -� 08. 09 <br /> I � o � <br /> I � I 10 m 11e � I� 12 13 14 <br /> ! � ' o a ° o`� o <br /> r ► � B � <br /> r z � o � B 15 16 17 1�� i19 <br /> � l � ; <br /> W � � ` ' 0 � 21'� 22 23� 24� 25 <br /> � . � �,. 1 : � 3 2 e <br /> , <br /> . . e I N ; : <br /> � � - ` � � <br /> s � ;� <br /> I� � � 2 � ' � 26 ----2��; 28 � <br /> � i ° � �� 2 I � <br /> � � � ° � � � �' I � -; <br /> I � <br /> ° ' �� _ �290 =- 30 <br /> I <br /> I � � °� <br /> -- -- -- -- -- -- -- -- — — — -- K EY P �AN � I <br /> MATCHLINE - SEE DWG 45-YD-C220-21 Or:�MAN I v <br /> 90% S U B M I TTAL SCALE: NONE <br /> N G I N E E R S 40 20 0 2a 4o so 0 <br /> P A R T I A L P LA N — R E M 0�A� 1601 Fifth Avenue, Suite 900�Seattle,WA 98101 , <br /> . „ , N ph 206.623.0717�fax 206.624.3775 I S S U E D F 0 R P E R M I T r <br /> S C A L E. 1 = 4 0 coffman.com S C A L E: 1:4 0 ' <br /> LASTING creativity�resulis�relatbnships � <br /> DRAWN DATE SUBTITLE CURRENT REYISION SYMBOL DATE y <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE �� L. ACCEPTABILITY J. PEARSON W1780788 B 05.09.�7 � <br /> A ADDED LIGHT STANDARDS & BARRIER IN STALL 110 W1780788 JMP BAO 03.21.14 �� oF WAs�r, THIS DESIGN AND/OR PAVING PLAN - REMOVAL � <br /> "U �ti . -• SPECIFlCATION IS APPROVED SHEEf � <br /> B 777X STALL MODIFICATIONS - PHASE 2 W4535737 CEI AH 05.09.17 �0�,��� ��� .;j� APPROVED BY DEPT. DATE CHECKED ��E 777X STALL MODIFICATIONS - PHASE 2 — u <br /> �220 1 � R � <br /> S ITE 45-YD ` <br /> �, asass � �� A V JOB N0. COMP N0. � <br /> �CISTYR� �' — <br /> �`�SSjoNaL��G� A v CIVIL MASTER EVERETT, Wq °wc No. 45-YD-C220-16R <br /> 5/9/2017 (PAPFR SPACFI SFF� 45—Y�—C9��R �W <br />