My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/04/04 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/04/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 10:08:33 AM
Creation date
5/10/2018 10:08:06 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/4/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> lip. <br /> 1V/47. <br /> { <br /> .F' <br /> ORDINANCE NO. <br /> AN ORDINANCE creating a special improvement project entitled "South <br /> Precinct— 911 Expansion Project", Fund 342, Program 026, to accumulate <br /> the design and construction costs for the improvement project. <br /> WHEREAS, SNOPAC, a building tenant, has merged with SNOCOM to become <br /> Snohomish County 911 and requires additional lease space and parking at the South <br /> Police Precinct located at 1121 S.E. Everett Mall Way. <br /> WHEREAS, the City Council has recognized the need to make repairs and alterations <br /> to the additional lease space in order to obtain occupancy. <br /> WHEREAS, the City Council has recognized the need to increase the amount of on-site <br /> parking. <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: A special construction fund is hereby established as Fund 342, Program 026 <br /> entitled "South Precinct — 911 Expansion Project" to accumulate the design and <br /> construction costs required for the project. <br /> Section 2: Authorization is hereby granted to the Facilities/Property Management <br /> Director under the administration of the Mayor, to assume full responsibility for <br /> conducting all tasks and performing all necessary steps to accomplish the actions <br /> authorized by this Ordinance. <br /> Section 3: The scope of work and cost of the project shall be determined through the <br /> Job Order Contracting project delivery method. <br /> Section 4: The sum of $480,000 is hereby appropriated to Fund 342, Program 026 <br /> "South Precinct— 911 Expansion Project". <br /> A. Use of Funds <br /> Design 40,000 <br /> Construction $ 440,000 <br /> Total $ 480,000 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.