Laserfiche WebLink
• SHGC Calculation • ENV-SHGC <br /> 2015 Seattle Energy Code Compliance Forms for Commercial Buildings including R2, R3,&R4 over 3 stories and all R1 Revised Feb 2017 <br /> Project Title: Klein Honda Addition Date 10/25/2017 <br /> %• 37.1% Max.Target: 40% For SDCI Use <br /> Fenestration Area asgross above-grade wall area <br /> Skylight Area as%gross roof area Max.Target: 5% <br /> Vertical Fenestration Alternates: 50%Conditioned Floor Area in Daylight Zone <br /> Notes:1-Proposed vertical fenestration and skylight areas entered in ENV-SHGC must match proposed <br /> fenestration areas in ENV-UA. <br /> 2-If Target Area Adjustment is required per ENV-UA,then target areas will be automatically <br /> adjusted in ENV-SHGC.Refer to Target Area Adjustments worksheet for this calculation. <br /> 3-Fenestration assembly SHGC shall be the manufacturer's NFRC product rating,or shall be the <br /> default value per Section C303.1.3. <br /> 4-Fenestration that separates conditioned space from a non-conditioned space shall be included <br /> in this worksheet.Enter target SHGC values for this fenestration under proposed SHGC,so it <br /> is neutral to the calculation. <br /> Skylights Proposed SHGC Target SHGC <br /> Sch.ID Provide SHGC source and fenestration schedule ID SHGC x Area(A) =SHGC x F SHGC x Area(A)= SHGC x A <br /> 0.32 <br /> SHGC 0.32 <br /> Skylight Totals <br /> All Non-North Vertical Fenestration+ Proposed SHGC Target SHGC++ <br /> PF <br /> Sch.ID Provide SHGC source and fenestration schedule ID PF SHGC x Area(A)=SHGC x A Category SHGC x Area(A)= SHGC x A <br /> Aluminum Table C402.1.3 I 0.40 1917 767 PF<0.2 ' 0.35 1917 671.0 <br /> 0.2_<PF<0.5 0.45 <br /> PF>_0.5 0.60 <br /> • <br /> ++If projection factor(PF)credits are <br /> applied to the proposed design, Target <br /> SHGC will sum fenestration area by PF <br /> category. <br /> +lf PF credit is applied then vertical fenestration Non-North Window Totals 1917.0 766.8 1917.0 671.0 <br /> must be entered in the correct table according to <br /> orientation. If credit is not applied then all vertical <br /> fenestration can be entered in either table. <br /> North Vertical Fenestration+ Proposed SHGC Target SHGC++ <br /> PF <br /> Sch.ID Provide SHGC source and fenestration schedule ID PF SHGC x Area(A)=SHGC x A Category SHGC x Area(A)= SHGC x A <br /> Aluminum Table C402.1.3 I 0.40 745 298 PF<0,2 0.53 745 394.9 <br /> 0.25PF<0.5 0.58 <br /> PF>_0.5 0.64 <br /> ++If projection factor(PF)credits are applied <br /> to the proposed design, Target SHGC will <br /> sum fenestration area by PF category. <br /> North Window Totals 745.0 298.0 745.0 394.9 <br /> TO COMPLY-The Proposed Total SHGC x A Area SHGC x A Area SHGC x A <br /> shall not exceed the Target Total SHGC x A. Total(Skylight+Window) 2662.0 1064.8 2662.0 1065.8 <br /> Component Performance Compliance (SHGC) SHGC COMPLIES <br /> D <br />