My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Matrix Consulting Group 5/4/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Matrix Consulting Group 5/4/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 11:42:24 AM
Creation date
5/15/2018 11:42:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Matrix Consulting Group
Approval Date
5/4/2018
Council Approval Date
5/2/2018
End Date
12/31/2018
Department
Administration
Department Project Manager
Paul Kaftanski
Subject / Project Title
Organization Assessment of Public Works
Tracking Number
0001217
Total Compensation
$81,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qualifications Overview to Conduct a Public Works Assessment EVERETT, WASHINGTON <br /> Prepare a Draft and Final Report and Provide Plans for <br /> Implementing Improvement Opportunities in the Organization <br /> and Operations of the Public Works Department. <br /> Once the work tasks noted above have been completed, our analysis, findings, and <br /> conclusions will be documented and reviewed with the Department. The draft and final <br /> reports will contain the following elements: <br /> • An executive summary that provides all recommendations, associated costs and <br /> cost savings, and priority of implementation. <br /> • Detailed analysis of each identified improvement opportunity. <br /> • Recommended staffing allocations. <br /> • An implementation plan for each improvement opportunity recommended. <br /> Once staff and the Project Steering Committee have reviewed the draft final report and <br /> implementation plan, and provided input, we would develop the final report and deliver it <br /> to the Project Steering Committee. We would be pleased to present our findings to the <br /> City in whatever forum is desired. <br /> TASK RESULT <br /> The product of this task would be the draft and final reports which would be <br /> reviewed with the City and presented in whatever forum is desired. <br /> 4. Project Schedule <br /> The table, which follows, presents the proposed timeline for completing the tasks <br /> identified in our Scope of Work. We have proposed a work plan that would complete this <br /> project over a maximum five-month time period. <br /> Month <br /> 1 2 3 4 5 <br /> Profile and Data Collection <br /> Best Practices/Comparative Analysis <br /> Employee Survey <br /> Staffing and Operational Assessment ---- <br /> Organizational Structure Assessment <br /> Draft and Final Report <br /> Matrix Consulting Group Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.