Laserfiche WebLink
� <br /> STATEMENT OF SPECIAL INSPECTIONS 2015 IBC SPECIAL INSPECTION REQUIRED BY 2015 IBC <br /> 1. IN/1CCORMNCE TO SECTION 17042 OF TFff 2015 INTERNA710rW.BUILDING CODE If�IG7FD REMS REWHPoNG SPECIAL INSPECTION ARE IDEMIflED UNDER COLUHNS'FREQUENCY OF INSPECTION'AS'PERIODIC'OR <br /> (IBCI,THE OWNER,OR 7FE REGISiERED DESIGN PROFESSpNN.IN RESPONSIBLE �NUOUS'.IF NO BOX IS CHEqCED,EITHER THE TASK DOES NOT IXIST OR DOES NOT NEED MIY SPEW�L INSPECiION. <br /> �WJtGE ACi1NC AS THE OMMER'S NGENT,IS REQUIRED TO HIRE AND WDEPENDENf <br /> '��i��E`����o�oR�RE«,�Rm SPE�„�N�`�. STRUCTURAL STEEL (IBC 1705.2.1, 1705.11.1 & 1705.12.2) NONDESTRUCTIVE TESTING (TABLE N5.4-3, AISC 360-10): <br /> 2. 7HIS STATEIAENf OF SPECIAL INSPECTIONS SUBMfITED BELOW IS FULFlLLAIENT OF <br /> n�E aEan�ars oF 2o�s iec s�cno�s noa nroo no5. PRIOR TO WELDING (TABLE N5.4-1, AISC 360-10�: <br /> 3. SPECULL INSPEC710NS AND TESi1NG WILL BE PERFORMED IN ACCORDANCE MATH THE �M FREOUENCY OF�ISPECTION INSTRUCTIONS <br /> APPROVED PIANS AND SPECIFlCATKNIS,1HIS STATEMENT,IBC 2012 CHAPIER 17 AND C,IP WELpg(RISK CAT II CONIINUOUS ❑ PERIODIC � ULTRASONIC TESTING SW�LL BE PERFORMED <br /> AISC 360-10 SEC110N'N5'. ffEM FREQUENCY OF INSPEC110N INSTRUCTIONS � ON 10%OF CJP GROOVE WELDS IN BUff, <br /> T-AND CORNER JOINTS SUBJECT TO <br /> 4. THE INSPECTOR SW1LL OBSER'VE THE WORK FOR COAIPW�NCE WRH THE JURISDICTION y�IFY WELDII�PROCEDURES(WPS) CONTINUOUS � PERIODIC ❑ 7RANSVERSELY APPLIED TENSION L�DING IN <br /> APPROVED PIANS,SPECIFlCAl10NS,AND APPLICABLE PROVISIONS OF THE IBC,7HE �WO f�NSUMABLE CER7IFlCATES MATERWS 5/16-INCH 7HICK OR GRFATER <br /> ARCNIIECTS/ENGWEER'S RENEWED SHOP DRAWINGS,AND/OR PUCEMENT DRAWINGS, TESTING RATE MUSf BE INCREASED OF>5X <br /> AIAY BE US�o ONLY AS AN AID TO INSPECTIONS. OF WELDS TfSTED HAVE UNNCCEPTABLE <br /> a. CONfINUWS SPECUiL INSPECTION -7HE FULL-TIME OBSERVAlION OF WORK ���IDEMIflCATION CONfINUOUS ❑ PERIODIC � VERIfY iYPE AND GRADE OF AIATERW. pEFEC7$, <br /> REQUIPoNC SPEGAL INSPECTION BY AN APPROYED SPECIAL INSPECTOR WHO IS <br /> PRESENf W THE AREA WHERE 7HE WORK IS BEING PERFORAIED. yyp,p���FlG710N CONiINUOUS ❑ PERIODIC � A SYSfEAI SIUI.L BE MAINfAI�D BY WHICN A ��S HOLES(FUNCE>27 CONiINUOUS ❑ PERIODIC � TESTED PER AISC 360-10-5C. <br /> b. PEPoOqC SPEW�L INSPECTION-THE PART-71ME OR INfERMITfENT MIELDER WHO HAS MiELDED A JOUlf OR <br /> OBSEaVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED �������' <br /> SPEG�L INSPECTOR WHO IS PRESENT IN TME AREA WHERE THE WORK IS BEING �MELDED JO�NIS SUBJECT TO FATIGUE CON7INUOUS � PERIODIC ❑ PER AISC 360-10-5D. <br /> PERFORIAED AND AT THE COAIPLETION OF THE WORIC. FlT-UP GROOVE WELDS CONIINUOUS ❑ PERIODIC � VERIFY JOINf PREPARATION.qMENSIONS. (NOTE t) <br /> q.EMlLIN6S,TACKING,AND B?CKING <br /> 5� ��,�o��DALY SRFPORTS SFWl REAWNLAT TMER�B SIIE WITH THE PRIOR TO BOLTING (TABLE N5.4-3, AISC 360-10): <br /> CONfRACTOR FOR 1HE BU0.DING DMSWN'S INSPECTOR.hIE REPORIS SHALL AGCESS FIOLES COMINUOUS ❑ PERIOUIC � �ERIFY WNFlWRA710N AND FlrNSH. <br /> INCIUDE THE FOLLOIYMIG. ITEIA FREWENCY OF MISPECTION INSTRUCTIONS <br /> a. WUdE OF SPEqAL INSPECTOR AND DATE 7}#INSPECiION WAS PERFORAIED. fff-UP OF FlLLET WELDS CONfINUOUS ❑ PERIODIC � VQtIFY ALIGNYFNT,GAPS AT ROOT, <br /> b. DESCRIP710N OF TFff INSPECTIOl1S.WRH LOGiIONS AND lES7S PERFORMm. CLFANLJNESS OF STEEL SIX2FACES.AND TAq( CEKIIFlCATpNS OF FASiE1�RS CON7INUOUS � PERIODIC ❑ <br /> WELD al.W.f1Y AND LOCAiION. <br /> c. LISIING ANY NON-CONFORGING REMS. FASTENERS W�RKm CONIINUOUS ❑ PERIODIC � VERIFY hNT F/STENERS W1VE BEdJ AIARKED I <br /> a. �auo�How rra�s w�E r�savEo oe uNr�so�v�o. DURING WELDING (TABLE N5.4-2, AISC 360-10): nccoRo,wce wrrH nsr�r�ou�ars. <br /> e. LIST M(Y CFIANGES OR CORREC110N5 TO NON-CONFORNING ISSUES AUfHORRED � FREqUENC`(OF INSPEC710N INSTRUC710NS pROpER FASTENERS FOR JOINT CONIINUOUS ❑ PERIODIC � VERIFY GRADE,IYPE.AND BOLT LENGTH IF <br /> BY THE ENqNEQt,ARCHftECT,OR BUILDING DMSION'S INSPECTORS. <br /> THREADS ARE DCCLUDED FROM TFff SHEAR <br /> 6. 7HE INSPECTOR SHALL BPoNG NON-CONFORMING fIEMS TO 7HE IMMEDNTE ATIENTION OF �pF q�FlED WELDERS CONTINUOUS ❑ PERIODIC � VERIFY THAT WELDERS ARE APPROPRUTELY �E <br /> THE COMRACTOR,AND NOTE ALL SUCH ITEAIS IN THE DAILY REPORT.IF ANY REN IS N0T �Flm <br /> RESOLVED IN A iIMELY MANNER AND IS ABOUf TO BE INCORPORATED IN THE WORK,THE PROPER BOLi1NG PROCEDURE CONTINUOUS ❑ PERIODIC � VERIFY PROPER PROCEDURE IS USED FOR THE <br /> SPECIAL INSPECTORS SHALL IMMEDk1ELY NO71FY THE ENqNEER OF RECORD. <br /> CONfROL AND HANDLING OF WELDI CONTINUOUS ❑ PERIODIC � VERIFY PACKAGING AND IXPOSURE CONiROL JOINf DEfAII. <br /> 7. THE INSPECiION PGENLY SHALL FURNISH MONTHLY REPORTS OF THE TEST AND �SUMABLES <br /> M�/OR OTHERS AS DESIGNAIED.Y TO 1NE BUILDING DMSION,ENqNEER OF RECORD, �Km TAq(WELDS CONIINUOUS ❑ PEPoODIC � VERIFY THAT WEIDM6 DOES NOT OCCUR �NECTING dEAIENTS CONiINUOUS ❑ PQtIODIC � ��NP DR OLE PREPARATIOtJ, F <br /> OVER CRACKED TACK WELDS. SPECIFlED,MEET REWIREIIEMS. <br /> 8. THE�NSPECTION AGENCY SW�LL SUBMR A FlW�L SIGNED AND SEAI.ED REPORT TO THE <br /> BUILDWG DMSION STA7ING iHAT ALL REMS REQUIPoNG SPECIAL INSPEC110NS AND TESIING PRE-INSfAIlATION VERIFlGTION CONIINUOUS ❑ PERIODIC � OBSERVE AND DOCUMENT VEPoFlCATION <br /> WERE FlR.F1LLED,ALL dSCREPANqES WERE CORRECIED OR RESOLYED,AND ALL WOPo( pry�(tONyp�(TAL�pNqTpNg COMINUOUS ❑ PERIODIC � ypa�y Wp�p SPEED IS MIITFNN LIMffS AS WELL 7a7�N6 1ES11NG BY INSTALlA710N PERSONN0.FOR <br /> REWIRING SPECIAL INSPEC710NS IS IN CONFORW�NCE WITH 7HE APPROVED DESIGM AS PRECPffATIOW AND TEMPERA7URE <br /> DRAMIWfiS AND SPEqFlCAl10NS MO APPLICABLE CODES.ANY REMS UNRESOLVED OR FASfENER ASSEMBLIES AND AIEfHODS USED. <br /> DISf�tEPANCIES IN CWERhGE I.E.AIISSED INSPECfWNS.PERIODIC @JSPECfIONS WHEN y�pg FpLLpyyEp COI�IINUOUS ❑ PERIODIC � YERIFY ITEMS SUCH AS SEfIINGS ON WELDING <br /> CONfINUOUS WAS REQUIRED, C)SW1LL BE SPECIFIGLLY REUIZED IN THE REPORL E�py� �y�gp�p y�p�� pRpppt STpRAGE CONIINUOUS ❑ PERIODIC � VERIFY PROPER STORAGE OF BOLTS, BU15, <br /> 9. THE STATEAIENT OF SPECW.INSPECiION WS BEDJ PREPARm BY THE ENCINE�2 Y47ERIALS.SHIELDrJG G!S IYPE/FLOW RA7E. W/SHERS.AND OiHER FASfENER <br /> OF RECORD WfIFI THE UNDERSTANDING 7HAT THE BUILDING OFflCW.S WLLI: REtIEAT APPLIm. IMERPASS lEA1PERANRE COMPONEWfS. <br /> AIANITAINm AND PROPER POSI110N. <br /> a. REVIEW AND MPROUE THE OLtALIFlGTIONS OF TF#SPECUL INSPECTORS WFIO "NOT REQUIRED IF ONLY SrRJG-TIGHT JOINfS ARE SPECIF�D(PER SECTION N5.6(1)OF ASC 360-10) <br /> WILL PERFORM 7FE INSPECTIONS. WELDING 1ECHNQUES C01�(IINUOUS ❑ PERIODIC � VERIFY INfERPASS AND FlNAL CLEANING, EACH <br /> n. uoNRat s�cw.uisaEcnoN ncmmEs oN nie,roe s�ro�nu�r P�o"F""�w,��"�"�'AND DURING BOLTING (TABLE N5.6-2, AISC 360-10): <br /> iHE SPECIAL INSPECTORS ARE QUALIFlED AND PERFORAUNG iH�R DUIIES/S <br /> `u`E°Fo��"'"E�r��°�r o��`�`�"��no". AFTER WELDING (TABLE N5.4-3, AISC 360-10): �" �W��"���" �"���"s <br /> �. �nEw sue�mm i�cnorr R�aoRrs. <br /> d. PERFORM INSPEC710NS AS REQIARED BY iHE LOCAL BUILDING CODE. <br /> REM FREWENCY OF INSPECTION I� FA5TENER ASSEMBLIES CONnNIlOUS ❑ � � �qg��pNDffION,PLACED I��HOLES, <br /> AND WASHERS ARE POSI110Nm AS REOURED. <br /> e. WILI,I$SUE CERTIFlCATION OF OCCUPANCY AFIER ALL SPECIAL INSPEC110N WELpS CLFiWED COIJIINUOUS ❑ PERIODIC � VERIFY THAT WEI.DS H4VE�1 PROPFRLY <br /> REPORTS AND THE FINAL SPECW.INSPECTION REPORT HAVE BEEN SUBMIITED (X�µEp ' <br /> AND ACCEPTED. SNU6-TIGHT PRIOR TO PREfENSIONWG CONiINUOUS ❑ PERIODIC � VERIF'!THAT JqNTS ARE BROUGHT TO SNU6- <br /> TIGHT CONDffION PPoOR TO PREIENSIONING <br /> �LENGfH,AND LOCA710N OF CONIINUOUS � PERIODIC ❑ �qJ�p�. <br /> FASfENER COMPOI�M CONIINUOUS ❑ PERIODIC � VERIFY THAT FASTENER COMPONEM IS NOT <br /> WELDS AIEET VISUAL ACCEPTANCE COMINUOUS � PERIODIC ❑ TURNED BY WRENCH PREHENfED FROM <br /> atrt�u RoranNc. <br /> p(K$7(�(E$ CONfINUOUS � PERIODIC ❑ PREIENSIONm FASfENERS CONTINUOUS ❑ PERIODIC � VERIFY THAT FASTEI�RS N2E PREIENSIONED <br /> IN ACCORDANCE WffH RCSC SPECIFlCATION. <br /> PROGRESSING SYS7QMTICALLY FROA1 THE <br /> K-AREA CONTINUOUS � PERIODIC ❑ MOST RIqD POINT TOWARD iHE FREE EDGES. <br /> +;N0T REQUIRED IF ONLY SNUG-TIGFIT JqNTS ARE SPECIFlED(PER SECTION N5.6(1)OF AISC 360-10). <br /> BACICING dc WELD TABS REAIOVm WNIINUWS � PERWDIC ❑ "NOT REQUtltED FOR PREIQrSlONm JOIMS USING NRN-OF-THE-NUf MEIHOD WI1H IMTCH-MARIONG.qRECT- <br /> TENSION-MDIf'ATORS.OR 1WISf-OFF IYPE TENSION COIdIROL MEfHOD(PER SEC710N N5.6(2)OF AISC 360-10). <br /> REPAIR ACTMfIES COMINUOUS � PERIODIC ❑ <br /> ����� �N� � ��� � ISSUE �OR COf� STRUCTION <br /> �c,ar,o�wa.om.ia�r,w� <br /> �sw xMaox n Kvro� uvc rn x�ecx er �vnalm atc sem�c cunc�a�cww�w sneoi. oac � <br /> ��i�� c.aassn� a.�o.n SUPPORT STRUCTURE FOR NEW CHILLER <br /> �mw s t.a�d a.io.n ,�r � <br /> �BOE���� iewa.co x amr. ah C.R065ELL at.tan � SRE COOUNG TOYIERS REPLACEYENT c� g _ . <br /> v <br /> a.�o.n 40-041 ROOF � � � � <br /> .��. 2oe�s�t �.� r"" _� � <br /> a o a.io.n � <br /> SiRUCTURAL MlS1ER EVEREff.WA°"0 ND' 40-041-52 � v <br /> �F ,�� <br /> � ,.;,.�" <br /> `'�.-.,w_.:,..:, <br />