Laserfiche WebLink
s <br /> 1. Demolish the wall and reconstruct it entirely under the established permit process, <br /> or <br /> 2. Secure and submit revised engineering that accurately represents the wall as built, <br /> and provide a letter from the engineer of record that the wall as built, complies <br /> with all required construction codes. <br /> Upon resubmission of the drawings, your application will be given priority and plan <br /> review will begin. NO FINAL INSPECTIONS MAY BE CONDUCTED UNTIL THIS <br /> ISSUE IS RESOLVED. <br /> All required submittals must be of sufficient detail and contain sufficient information to <br /> ensure that the proposed structure will be constructed in compliance with all adopted <br /> codes. <br /> Sincerely, <br /> Ton . Lee <br /> Assistant Building Official <br />