Laserfiche WebLink
2813 Rockefeller Ave. Everett, WA 98201• ph:425.317.8017 •fax:425.317.8489 <br /> i_1=,iiilC��lOil Oi c;C�'.ic� COiIS[fUCil:iil uii S�Cl1011 r'-�F�, il�r, U�cfl UGiI� iili011oil IlOiE� �ifl�� YEVi�IUil� �E't" <br /> structural. Plea�� refer to sl��ePr A-2.� f„�� ����:r� IPd��r c����in��tinn det�il. <br /> 6. Provide framing plan for the addition that specifies the size, spacing and grade of all framing <br /> lumber used to build the addition. The section drawing references the "spacing of studs per <br /> structural engineer". <br /> Response: ' �� � the detail wall assembly have been revised on °"^^�-��(sheet A-3.2j to <br /> reflect the size, spacing and grading of all framing lumber used to build the addition, roof framing <br /> plan is also provided, no floor framing needed at addition since the foundation was changed to <br /> concrete sl�h. <br /> 7. Show the location of the water heater and show how the addition will be heated. <br /> Response: Location of existing water heater highlighted on existing and proposed plans. Added <br /> note to proposed plan adding an+�a-a�l�(or� �vall)electric unit for freeze prevention in laundry <br /> room on sheet A-2.1. We have relocated the unit to be on adjacent wall between bedroom and <br /> laundr�i room (note: it���il! no lonaer he an "in �n�alP' unit h�it r�±her an "on-�A��II" unit). <br /> 8. Show how the roof at the Laundry Room addition is ventilated. <br /> - , , <br /> , , � � <br /> r �, <br /> 9. Provide minimum 50 CFM exhaust fan in the proposed Laundry Room vented to the exterior. <br /> � � � , � � � , � ,r„ _ � �,�� �� _��� % :� <br /> 10. Section CC on sheet A-3.2 shows insulation in the floor, walls and ceiling of the front porch. Please <br /> clarify if this space is to be converted into habitable, heated space. <br /> � � � �c no clianges to front oi ti�e <br /> 11. Provide handrail per section 307.1 of the International Property Maintenance Code <br /> (IPMC) <br /> Response: Denoied area ofi additiun ori sections/plans to show ti��t lhere are no changes to fronl <br /> of the house.�,�^,��-,;� �+fr,,.,+ �+,,,,� ; -,�r„-„�„„ ;.-+;.,,, -„�,�,,,, .,,,+o+„�h,,,,+ n �.,, We have <br /> upgraded the existing handrail at fror�t of the house in accordance to regulations with section <br /> R311.7.8 IRC. Please r�ferto sh�et o, 3.1 for addAd note and ele��at':."�, "i����s. <br /> ; ` <br /> �% _,- <br /> Sandra Martin, Project Production Manager <br /> Capital Architects Group PC <br /> 2 � Page <br />