|
2813 Rockefeller Ave. Everett, WA 98201• ph:425.317.8017 •fax:425.317.8489
<br /> i_1=,iiilC��lOil Oi c;C�'.ic� COiIS[fUCil:iil uii S�Cl1011 r'-�F�, il�r, U�cfl UGiI� iili011oil IlOiE� �ifl�� YEVi�IUil� �E't"
<br /> structural. Plea�� refer to sl��ePr A-2.� f„�� ����:r� IPd��r c����in��tinn det�il.
<br /> 6. Provide framing plan for the addition that specifies the size, spacing and grade of all framing
<br /> lumber used to build the addition. The section drawing references the "spacing of studs per
<br /> structural engineer".
<br /> Response: ' �� � the detail wall assembly have been revised on °"^^�-��(sheet A-3.2j to
<br /> reflect the size, spacing and grading of all framing lumber used to build the addition, roof framing
<br /> plan is also provided, no floor framing needed at addition since the foundation was changed to
<br /> concrete sl�h.
<br /> 7. Show the location of the water heater and show how the addition will be heated.
<br /> Response: Location of existing water heater highlighted on existing and proposed plans. Added
<br /> note to proposed plan adding an+�a-a�l�(or� �vall)electric unit for freeze prevention in laundry
<br /> room on sheet A-2.1. We have relocated the unit to be on adjacent wall between bedroom and
<br /> laundr�i room (note: it���il! no lonaer he an "in �n�alP' unit h�it r�±her an "on-�A��II" unit).
<br /> 8. Show how the roof at the Laundry Room addition is ventilated.
<br /> - , ,
<br /> , , � �
<br /> r �,
<br /> 9. Provide minimum 50 CFM exhaust fan in the proposed Laundry Room vented to the exterior.
<br /> � � � , � � � , � ,r„ _ � �,�� �� _��� % :�
<br /> 10. Section CC on sheet A-3.2 shows insulation in the floor, walls and ceiling of the front porch. Please
<br /> clarify if this space is to be converted into habitable, heated space.
<br /> � � � �c no clianges to front oi ti�e
<br /> 11. Provide handrail per section 307.1 of the International Property Maintenance Code
<br /> (IPMC)
<br /> Response: Denoied area ofi additiun ori sections/plans to show ti��t lhere are no changes to fronl
<br /> of the house.�,�^,��-,;� �+fr,,.,+ �+,,,,� ; -,�r„-„�„„ ;.-+;.,,, -„�,�,,,, .,,,+o+„�h,,,,+ n �.,, We have
<br /> upgraded the existing handrail at fror�t of the house in accordance to regulations with section
<br /> R311.7.8 IRC. Please r�ferto sh�et o, 3.1 for addAd note and ele��at':."�, "i����s.
<br /> ; `
<br /> �% _,-
<br /> Sandra Martin, Project Production Manager
<br /> Capital Architects Group PC
<br /> 2 � Page
<br />
|