Laserfiche WebLink
2813 Rockefeller Ave. Everett,WA 98201•ph:425.317.8017 •fax:425.317.8489 <br /> City of Everett <br /> Public Services Department „� ._ <br /> 3200 Cedar Street ;���E��' �� � _= � U� �.'�-� .^� <br /> Everett, WA 98201 ; r,.., �'"'S � <br /> i �� ��� Z ��7 <br /> 2.22.2017 � �� 7 � <br /> Re: PLAN CHECK NUMBER: C1609-027 '•�� ' �' �� �V�.RETT <br /> PROJECT NAME: Sawiris Residence ���r�?R� ��'��?!'`"`'�' <br /> PROJECT ADDRESS: 2107 Grand Ave. <br /> Building Division <br /> 1. The proposed Bedroom does not meet the minimum area for habitable space per IRC section <br /> R304. <br /> _ �edrooi�� square footage has been revised on proposed floor plan to be 70 sq. ft. on <br /> � � �� in sheAt�-7.7 per IRC section R304. <br /> 2. Specify the U-Value for all new fenestration on the construction drawings (you have chosen to use <br /> option 1a for your energy credits, notations need to reflect those values on the plans). <br /> -., �� , � �� � <br /> � � ���. ��y �.o�. .- <br /> Information. Addition�lly,Added U values on the window scl�edule sheet A-2.1 for the new <br /> ��iindow (U=.28) to reflect the values per�.�!SFC Tahle 405.Z_, o�tion 7�. <br /> 3. Specify the pitch of the roof at the proposed laundry room addition. 3-tab composition roofing <br /> requires a minimum pitch of two units vertical in 12 units horizontal per section R905.2.2 IRC,the <br /> plans show%z unit vertical in 12 units horizontal. <br /> � ����f � �: �� �,,�,� ' ��i:�� � � �nembrane single ply to match the roof pitch <br /> (VIf) o�i� ihe existing i�ooi over t�f�e dining roorn. �i�anges made to proposed roof plan on sheet A- <br /> 7_.2 to reflect this. <br /> 4. Provide R-10 rigid insulation at all headers in bearing exterior walls per Table R402.1.1 of the <br /> WSEC. Show on plans. <br /> �i�� � _ �� � � ��.��, � � � � i� _ ,,� , <br /> , I _ <br /> 5. Section AA and Section CC on sheet A-3.2 show similar construction in the Dining Room and the <br /> Laundry Room,while Wall Section 1 on Sheet A-3.3 shows something completely different in the <br /> Laundry Room.The section drawing at the laundry room shows the roof of the addition supported <br /> by the existing partial height exterior wall at the house. Please clarify the actual construction at <br /> this location. Provide ledger detail if applicable (section and elevation of ledger)showing all <br /> connectors. <br /> „ _ __ _ � _ _ _ ,_.., .� ,�c,��� <br /> Response: Both sections show the correct construction at this location. T"^..,^"���*�^„ ' ^^ <br /> �h�„+ n � � �-,� h„o„ ,-o.,.,,,,,o,� (entire sheet A-3.3 has been ren�ovecl froi7i tfie set). We have <br /> revised the foundation and roof framing at the addition per structural engineer's revisions. <br /> Attached are structural details, sheet S-1,for the connections at the foundation and roo+. <br /> 1 � Page 1 <br />