Laserfiche WebLink
Steve Miller <br /> From: Yoshua Angersbach <yoshadventure@gmail.com> <br /> Sent: Thursday, June 30, 2016 11:36 AM <br /> To: Steve Miller - <br /> , _ _ <br /> � --- <br /> Subject: sh's project, 2314 Hoyt Ave �' <br /> Attachments: imagel.JPG; ATTOOOOl.txt; image2.JPG; ATT00002.txt; image3.JPG; ATT00003.txt; <br /> image4.JPG; ATT00004.txt; imageS.JPG; ATT00005.txt; image6.JPG; ATT00006.txt <br /> Steve, <br /> Below are photos of the damage studs and waste lines.You can see these are only 2 inch cutouts. <br /> The remaining studs are not impacted as the toilets waist line runs parallel to the floorjoists. <br /> The photo is been included showing the toilet waist line runs parallel to the floor joist, passes through the wall and into <br /> a "framed box" which connects to the sewer's vertical "stack". <br /> I believe all damaged floorjoists, can be resolved by"double sistering" 2/6" to either side of the existing floor joists. <br /> The studs impacted by the 2 inch waist line, could be resolved using 1 inch strips of three-quarter inch plywood Rim <br /> Shank nailed to the top and bottom of the existing 2 x 6 floorjoist. (see attachment for calculations). <br /> Thank you and please advise if you concur? I could have the work completed this weekend and ready for inspection on <br /> Monday. <br /> Thankyou <br /> Yosh <br /> 206-718-8258 <br /> Yoshadventure@�mail.com <br /> 1�, ,a <br />