. PlJBLIC �ORKS PERMIT DateApplied: 10/25/2017
<br /> City of Everett Public Works Department Public Works Permit#: PW1710-037
<br /> 3200 Cedar Street Parent Permit#:
<br /> Everett, WA 98201 Planning Reference#: PreAppl7-027
<br /> `:�>fh:•.;;.:4� ., .
<br /> (425) 257-8810 Public Works Fee: $245.00
<br /> � �. -� �� �� � , i
<br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS:
<br /> PORT OF EVERETT PORT OF EVERETT
<br /> 1205 CRAFTSMAN WAY STE 200 1205 CRAFTSMAN WAY STE 200
<br /> EVERETT, WA, 98201 EVERETT, WA, 98201
<br /> PHONE: 4252593164 PHONE: 4252593164
<br /> TAX PARCEL ID#: 29051800102200 SITE ADDRESS: 1210 W MARINE VIEW DR
<br /> DESCRIPTION: DEMO EX UTILITIES TO PREP FUTURE SUBSTATION SITE
<br /> Demolish, relocate, and connection sanitary sewer line (force main cleanouts to be salvaged and reused). Natural gas line to
<br /> be capped by PSE; contractor to remove underground line after capping both ends at demo limits. Coordinate with City Water
<br /> Department to remove fire hydrant per Everett Fire Department request. Remove three private parking lot light poles.
<br /> Asphalt/Concrete Paving=647SF
<br /> Clear/Grade/Fill/Excavate=399.4CY
<br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES
<br /> PERMIT CONDITIONS:
<br /> 1. All calls for inspection shall be made 24 hours in advance.
<br /> 2. All work shall be performed in accordance with the permit and current City of Everett `Design and Construction Standards
<br /> and Specifications for DevelopmenY.
<br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811.
<br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 12/22/2017.
<br /> Approved plans must remain on job-site at all times.
<br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a
<br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests.
<br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the PW Inspector's direction.
<br /> Remove upon completion of the project prior to final approval of the permit.
<br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway.
<br /> 8. Protect all existing underground utilities (to remain) during construction.
<br /> 9. Contact the COE Water Department to turn any water valves prior to working on the hydrant to be removed/salvaged.
<br /> Public Works Permit Fee Breakdown: �,;�.:, ;.,
<br /> Pavin 647sf ................................................$45.00 �.`='',�'�.. , , ,
<br /> g ( ) , � ,,
<br /> Erosion Control...............................................�50.00 �„�;' �;,.,
<br /> Grade/FilUExcavate.......................................$110.00 �, ���'� � �) ;
<br /> PW Plan Review.............................................$20.00 „4.,�� 8 �o�� � ;
<br /> PW Site Inspection..........................................$20.00 ,,� o°,a�, ,�,J` �,;,,;
<br /> c\,y,,' ,' ;� , , 1,- -K ::
<br /> ,,.;. .,, 1-rh ..,,,,.•
<br /> ' �"�
<br /> 1'�-i
<br /> City ofEverelt O�cial Use Only ACKNOWLEDG�NtF��F%�ONDITIONS
<br /> '' The undersigned owner/applicant hereby agrees to hold and save
<br /> �' �- � I harmless the City of Everett from any and all claims for damages, costs,
<br /> ���y ' 4 ,� / � �, expenses, or causes of action that may arise because of installation and
<br /> ��1��- ��`— maintenance of the improvement or other right-of-way use here to applied
<br /> Ap roved for Construction (Public Works) �ate for and further agrees to remove same upon notice from the City and to
<br /> replace public property damaged thereby.
<br /> FINALINSPECTION Date ����� rz-�z�—�7
<br /> Approved as Constructed (PW Inspector) Signature of Applicant Date
<br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFfER IS TO BE DILIGENTLY PURSUED TO
<br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION.