Laserfiche WebLink
� � � � <br /> Transm ittal <br /> To: Sabrina Fandler <br /> City of Everett—Public Works <br /> 3200 Cedar St. ,,. ...,, _ ._ _ ._ ;. .. _ ___. <br /> Everett, WA 98201 � ' .;�; ,� ,,�,. , <br /> � i .__ �� <br /> ; : <br /> � , � <br /> From: Brandon Whitaker ; i�, l�l,�� 1 $ ZQil <br /> Date: October 18, 2017 �:';�!�Y U F E V E R E T T <br /> Re: Port Gardner Substation Utility Relocations project '������ ��'��`�`��'� <br /> Please find attached the following: <br /> Qty. Description <br /> 1 Public Works Permit application <br /> 3 11x17 project drawings <br /> Remarks: <br /> Hi Sabrina, <br /> Per our earlier discussion on this project, please find attached the above referenced items for our Public <br /> Works permit application. <br /> In 2018 Snohomish County PUD is planning to build a new electrical substation to provide power to the full <br /> build out of the Port's Waterfront Place Central development. Ahead of that project,the Port has been <br /> tasked with removing utilities that run undemeath the future substation pad. <br /> Please note the fire hydrant called out for relocation in the drawings is proposed to be removed altogether <br /> by Everett Fire. The Port will work through the City Water dept. on this request, and we will correct our <br /> drawings to reflect this as well. Please let me know if you have any questions. Thank you. <br /> Sincerely, <br /> ���`'o��,x��ZG�,�%:�� <br /> Brandon M.Whitaker <br /> Port Gardner Substation Utility Relocations—Public Works Permit submittal <br />