Laserfiche WebLink
� • • � ' � � � <br /> 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 <br /> PfOJ2CI TItl2: Seaway Transit Center - Comfort Station Date <br /> Applicability Code Location in Building <br /> (yes.no,na) Section Component Compliance information required in permit documents Documents Department Notes <br /> In single story buildings,provide Iist of enclosed areas that exceed 2,500 <br /> sf,have ceiling height greater than 15 ft.and are space types required to <br /> comply with this provision.For each area identify space type,floor area; <br /> floor to ceiling height,and any exception taken; <br /> Spaces in single For each area provide calculations for percentage of conditioned floor area <br /> na C402.4.2 story buildings located within a daylight zone including skylight and eligible sidelight <br /> requiring skylights daylight zones; <br /> For each area provide calculations for percentage of skylight area,OR; <br /> Provide calculations for skylight effective aperture(Equation C4-5); <br /> Indicate haze factor of skylight glazing material or diffuser <br /> AIR LEAKAGE <br /> Indicate location of continuous air barrier on plans and sections, <br /> Air barrier <br /> C402.5.1.1 construction and Provide details for all joints,transitions in materials.penetrations in air <br /> sealing barrier and note method of sealing(caulked,gasketed,or other approved <br /> m eth od) A2.4-A2.7 <br /> Rooms containing Indicate that room(s)containing non-direct vent appliances is isolated from <br /> open combustion inside the thermal envelope with a sealed air barrier, including doorway <br /> - C402.5.3 fuel burning gasketing and sealing around ductwork and piping penetrations; <br /> appliances used for Indicate insulation provided in wall,floor and ceiling of the room envelope, <br /> space conditioning and insulation required on combustion air ductwork <br /> Access openings Indicate locations of all access openings and doors to shafts,chutes, <br /> na C402.5.4 and doors to shafts, stairways and elevators; <br /> chutes,stairways Indicate method of gasketing,weatherstripping and sealing of these <br /> and doors openings <br /> Indicate locations of all stairway enclosure,elevator shaft and building <br /> C402.5.5 Outdoor air intakes, pressurization relief openings,outside air intakes and exhaust openings; <br /> na exhausts and relief Note in envelope plans that all relief,outside air intake and exhaust <br /> C4032.4.3 <br /> openings openings shall be provided with dampers in accordance with Mechanical <br /> Section C4032.4.3 <br /> Indicate method of sealing between light fixture housing and wall or ceiling; <br /> � - C402.5.8 Recessed lighting in <br /> building envelope Note in envelope plans that all recessed lighting fixtures shall be IC rated <br /> and have an air leakage rating not greater than 2 cfm per ASTM E283 test: <br /> include these requirements in lighting fixture schedules <br /> ���: C402.5.6 Loading dock seals Indicate weather seal at cargo and loading dock doors <br /> Indicate locations and dimensions of vestibules and air curtains; <br /> Indicate exception and criteria utilized for all building entrances and exits <br /> that do not have a vestibule or air curtain; <br /> na C402.57 Vestibules — <br /> Indicate required performance for air curtains installed per exception 7; <br /> For unconditioned vestibules,indicate which envelope assembly(interior <br /> or exterior)complies with the requirements for a conditioned space <br /> Indicate on plans the air barrier boundaries and area calculations on all six <br /> sides of the air barrier; <br /> Indicate air barrier test method in accordance with ASTM E779 or <br /> approved equivalent; <br /> C1032 Building air leakage Indicate required maximum leakage rate for compliance. <br /> }�y C402.5.12 test Include the following requirements in project documents:(1)Submit air <br /> barrier test report to jurisdiction once test is completed;(2)If test results <br /> exceed 0.4 cfm/ft2 at 0.3 in.wg,then visually inspect air barrier and seal <br /> noted sources of leakage;(3)Submit a follow-up report to jurisdiction <br /> noting corrective measures taken; (4)Include air barrier test report in <br /> compliance documentation provided to owner. A2.4-A2.7 <br /> If"no" is selected for any question, provide explanation: <br /> End of Building Permit Plans Checklist <br /> � ' ' <br /> , r <br />