Laserfiche WebLink
Benyam Stephanos <br /> From: Michael Brick <br /> Sent: Monday, April 03, 2017 9:02 AM <br /> To: Benyam Stephanos <br /> Subject: 5207 Evergreen Way Parking Lot <br /> Benyam, <br /> Here is Traffic's comment on the proposed parking lot work: <br /> The parking layout has been modified from the approved layout at the time of construction. The City of Everett <br /> does not have any record of review and approval of the current parking layout. As such,when the parking lot is <br /> repaved and restriped the parking layout must be brought into compliance with current City of Everett design <br /> standards. Traffic Engineering does not anticipate that this will result in a net decrease in the on-site parking <br /> supply. <br /> If you need any more information for your response let me know, <br /> Michael Brick, P.E. <br /> Associate Traffic Engineer <br /> City of Everett Public Works <br /> (425)257-7790 <br /> 1 <br />