My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10710 EVERGREEN WAY 2018-06-01
>
Address Records
>
EVERGREEN WAY
>
10710
>
10710 EVERGREEN WAY 2018-06-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2018 11:43:20 AM
Creation date
5/29/2018 1:40:56 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10710
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVER <br /> REVIEWED FOR t'7( <br /> Proposal <br /> ROOFCORP OF WA INC. <br /> P.O. Box 69315 PROPOSAL: 007441 DATE: 04/10/17 <br /> Seattle, WA 98168 Casablanca Apartments L&M <br /> (206)439-9991 Fax (206) 439-9995 Buildings L&M <br /> CLIENT: 10096 PROJECT: 003358 <br /> Epic Asset Management, Inc CONTACT:Andrew Hermer/TJ Casablanca Apartments <br /> 219 E Garfield St Ste.600 PHONE: (206)819-2008 10710 Evergreen Way <br /> Seattle,WA 98102-3776 FAX: ( ) - Everett, WA 98121-4346 <br /> Work Specifications <br /> [A]PROJECT SUMMARY:Thank you for the opportunity to provide our proposal for roof replacement at the above referenced <br /> project. <br /> 1. ROOF AREA:Buildings L&M <br /> 2. ROOF WORK SUMMARY:Comp Shingles 30 Yr,details according to SGA drawings dated 12/5/16;Sheets A 4.3 and A4.6. <br /> [B]QUALITY ASSURANCE:As a certified manufacturer warranted installer,ROOFCORP is dedicated to maintaining high quality <br /> standards of workmanship and professionalism,including the following: <br /> 1. WARRANTY MANUFACTURER:30 Year material,per the manufacturer's written warranty. <br /> 2. WARRANTY ROOFCORP:7 year labor according to the attached warranty sample. <br /> 3. ANNUAL INSPECTION: Each year for the first(2)years ROOFCORP will perform annual roof inspection to ensure roof is <br /> performing as intended and in compliance with warranty maintenance requirements. <br /> 4. PERFORMANCE BOND:An independent surety bonding company has pre-approved ROOFCORP for a performance bond on <br /> this project.Upon request,a performance will be provided at additional cost. <br /> 5. INSURANCE:All work to be covered by Workmen's Compensation and$6,000,000 of Auto,Public Liability, Property Damage, <br /> Products Liability and Completed Operations Insurance.Customer may be named as a certificate holder upon request,subject to <br /> additional charges and availability of coverage. <br /> 6. SAFETY: In commitment to safety ROOFCORP shall be responsible to comply with all applicable local,state and federal <br /> requirements that are safety related. <br /> [C]SCOPE OF WORK: Provide labor,materials and supervision per the following specifications: <br /> 1, TEAR OFF:Tear off 1 existing roof system and haul away.All removed materials shall be directed to truck or dumpster via tear <br /> off chute or hoist with container.This will protect the structure,property;walls and general work area from damage while at the <br /> same time enhance job site safety. <br /> 2. STARTER METAL: Install new 26-gauge galvanized perimeter starter metal. <br /> 3. DRIP EDGE METAL: Install new 26-gauge galvanized perimeter edge metal. <br /> 4. CRICKETS: Install new 24-gauge metal crickets behind all chimeny stacks. <br /> 5. FELT: Nail over the entire roof area, 1-layer of synthetic felt The felt is to be installed starting at the lower edge of the roof and <br /> overlapping each other 2"on the upper edge and 6"on the ends. <br /> 6. STARTER:Install new starter and bleeder strips as per manufacturers specifications. <br /> 7. ROOF SYSTEM:Install 30 year architectual composition shingles according to manufacturer's specifications.Choice of color <br /> from standard color chart. <br /> 8. LEAD FLASHINGS: Install new lead penetration flashings at plumbing vents. <br /> 9. BATHROOM VENTS:Install new 4"PBK metal vents at all existing baths=: ,ucting. <br /> / 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.