Laserfiche WebLink
Proposal Page 2 <br /> Work Specifications <br /> 10.KITCHEN VENTS:Install new RV038 metal vents at all existing kitchen ducting. <br /> 11. HIP&RIDGE: Install new hip and ridge shingles at all required locations. <br /> 12. RIDGE-VENT: Install new 9"ridge vent. <br /> 13. CLEAN UP:During the course of this work, ROOFCORP shall use all means necessary to maintain the work area in a clean, <br /> safe,and orderly manner. <br /> [D]EXCLUSIONS:Any work not described above,Mechanical Work,Electrical Work,Wood Work,City Permits, Fire department <br /> Permits and WSST.Please note that roofing substrates may require additional testing such as pull out tests for wind up-lift <br /> requirements.Our proposal does not indude testing or upgrade to roof covering due to test failure. <br /> NOT INCLUDED: <br /> 1. VENTING NOT DESCRIBED ABOVE SUCH AS NEW INTEAKES AND OR ANY OTHER REQUIRED VENTING TO <br /> ACCOMODATE INTERIOR FIREWALLS. <br /> 2. INTERIOR INSULATED DUCTING. <br /> [E]PERMIT AND INSPECTION FEES:Customer shall pay all building permit,inspection and/or access fees required plus$75.00 <br /> for issuance costs.Please note that many cities have demolition recycling ordinances and the fees or deposits required are not <br /> included. <br /> [F]EXTRA WORK:If during the work process additional work is discovered,the contractor will immediately notify the owner.Any <br /> extra labor connected with repair work will be billed on a time($65.00 per man hour)and(material plus 20%markup)basis. <br /> [G]TIME FOR STARTING&COMPLETION:To be negotiated upon contract signing. <br /> [H]TERMS&CONDITIONS:This proposal is subject to the attached Terms&Conditions. Because firm prices cannot be obtained <br /> from suppliers,prices are subject to change if not accepted within 30 days. <br /> [I]PAYMENT:Progress billing on the 30th of every month <br /> [J]PRICE:Provide all equipment,labor and materials herein described,for the contract sum of: <br /> BASE BID: <br /> CHANGE ORDERS: <br /> 001 BLDG L <br /> INDICATE IF CHANGE ORDER/ALTERNATE IS ACCEPTED: Yes No <br /> Total C/O 001 $104,346 <br /> 3 <br />