Laserfiche WebLink
LEGEND <br /> O k������ PHASE 2 DEMO <br /> GENERAL NOTES <br /> 1 � � �' 11 .5 �2,5 1. THE BOEING EVERETT FIRE WSPECTION DEPARTMENT(425-342-2266)SNALL <br /> �2 � �3 BE NOTIFIED 24 HOURS IN ADVANCE OF ALL VALVE CLOSURES, FLUSHING, <br /> AND HYDROSTATIC TESTS ON THE FIRE PROTECTION SYSTEM. THE <br /> MAXIMUM DURATION OF A SYSTEM CLOSURE IS 8 HOURS. <br /> 2. THE FIRE PROTECTION SPRINKLER SYSTEM PIPING SHALL BE DESIGNED <br /> I � I PER NFPA#13, ORDWARY PIPE SCHEDULE AND PfPE SPACING. PIPE <br /> I � HANGERS SPACING SHALL BE PER NFPA#13. <br /> I i i � 3. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE WILL BE REQUIRED <br /> i I I I I I UPON COMPLETION OF THE TESTING.THE CERTIFICATE MUST BE SIGNED <br /> OFF BY THE BOEING EVERETT FIRE INSPECTOR DEPARTMENT PRIOR TO <br /> � i <br /> I I I � I � � 1 ST FLR FIRE � � I ( � I COMMENCING ADDITIONAL WORK ON THE FIRE PROTECTION SYSTEM. <br /> HOSE CABINET � � � I O <br /> I I � I INTERIOR " 2" F DN & TO FHC �• FIRE PROTECTION PIPING SHOP DRAWINGS SHALL BE SUBMITTED TO <br /> SEE DETAIL BOEING FIRE PROTECTION ENGINEERING AND MUST BE APPROVED <br /> � � � I � (TYP OF 2) � I ( I I FIRE HYDRANT WITH 6 HUB DRAIN (REF) BEFORE ANY MODIFICATION TO THE FIRE PROTECT�ON PIPING SYSTEM <br /> 5" STORZ COUPLING <br /> � i I ! I � � 1 M272 M513 � � I � I AND END CAP " N IN � BE�iNs. <br /> i � I I i i � FOR CONTINUATION SEE TOOLIN 5. ALL SPRINKLER PIPING 3"AND SMALLER SHALL BE SCHEDULE 40 ASTM A-53, <br /> I I j I OUTLINE OF SEE DETAIL pRqW�NG FME 141 W0000-1, SH M7 GRADE B, BLACK STEEL.ALL PIPING 4 AND LARGER SHALL BE ASTM A-53, <br /> � � 6'-0"X$'-0" i i 4" F�TO 1 M272 M513 <br /> I � I � � SERVICE TRENCH i HY RANT GRADE B,SCHEDULE 40 FOR VERTICAL RISERS AND MAY BE SCHEDULE 10 <br /> � � � I � I I q � �� I FOR HORIZONTAL CROSS MAINS. <br /> -- , � � -�,I-------,� � 8° TOWER RISER <br /> � ' 2�� F TO FHC r i I � 6. SPRINKLER SYSTEM PIPE FITTINGS SHALL BE 150 LB.THREApED <br /> �,,;� I I � I \ i - — - —� I — 6° HOSE RISER ��, MALLEABLE�RON FOR 1 1/2"AND SMALLER AND VICTAULIC GROOVED <br /> _ ��\ — — — — �� -- — — —r—� — — — — — — /������;�:[ I _ �!_ _ _ _ _ � j i���� ,—� _ _ _ _ _ _— — -, � `� FITTINGS FOR 21(2"AND LARGER. PIPE FITTINGS FOR 2" MAY BE EITHER <br /> /�— `+` f� ^(— �— I�'--�— ' '` � — I ,i — M 1501B.THREADED MA�LEABLE IRON OR VICTAULIC GROOVED. <br /> I -- j � I � � <br /> - - - -- - - -- - - --- - - � � � � ! I �-- -i-1 __-!� - - �r - �� � / , <br /> _ __ _ __ _ _ __ _ __ _ _ __ J — -- -- -- -- _ — --- — —. -_- — --_ __ _ ___ __ __ _ _ _ _ , __ __ __ __ _ _ _ _ _ _ J � I � � � 7. COUPLINGS FOR GROOVED PIPE ANQ FITTINGS SHALL BE VICTAULIC STYLE <br /> -- — — — -- --- — — — -- -- — — — — -- - - � �— — — --- -- — — — — — — ,� �- -- --- — — — — - -- — - — -- — — — — � — — - - -- 07 ZERO-FLEX UNLESS OTHERWISE NOTED. <br /> — — --- — — I <br /> -- -- — — — -- -- — -- -- --- -- — — — - � <br /> I 6° � ' 8. HYDROSTATIC TEST: PRESSURE-225 PSIG, DURATION-2 HOURS. <br /> I � 4�� I 1 ST FLOOR � 9. SEISMIC BRACING SHALL BE INSTALLED IN ACCORDANCE WITH FM <br /> SPRINKLER SYSTEM STANDARDS. SEE FM DATA SHEETS 2-8, "EARTHQUAKE PROTECTION FOR <br /> 4" HOSE CONNECTION 17'-0"AFF <br /> WATER—BASED FIRE PROTECTION SYSTEMS"FOR SPECIFIC DETAILS. <br /> � 4° F UP SEE DETAIL 10. AUTOMATIC SPRINKLER HEADS SHALL BE 165 DEGREE F.TEMPERATURE <br /> I � � (SIMILAR) �TED. <br /> 2 I ___ __ UPRIGHT SPRINKLER � <br /> 1 M272 M513 � _� HEAD, 165°F RATING(TYP) 11. ALL EQUIPMENT SHALL BE Ul LISTED AND FM APPROVED FOR FIRE <br /> SERVICE. <br /> I <br /> � _ �— — — — — — — — — — — — <br /> --- ----- ---- --- — — — — — — — — <br /> ; <br /> - ------� --- <br /> -- --- --� <br /> ---- -- - ---- � --- <br /> - -- -- -- -- - --- -- _- -- -_ -- <br /> ' � 1 ' - � REMOVAL NOTES <br /> � - -- - --- - -- - -- -- - - _ � <br /> , - - -- - - _- _ <br /> _ -- - <br /> - ---- - - - - --- - - <br /> -- _ - -- - -_ - - _ - -- - -�-, -- � �-_ <br /> � ( �-- - --- -- - - -- -- - - - - - - -- -- - -- -- - i - 1- -_- f�- -- _ -- - -- -�i-_ -_ � I � - --- -- -; r- - ---- -PENDENT-SPRINKtER=__-._-_ - - -- -- - - - - -, „ <br /> � � � r� -- �- -- - - -- - - = -- - -� -- 1��' REMOVE FIRE LINE BACK FROM TOOL TO 8 RISER AND CAP AS PART OF <br /> I � � r� � I ; �; `�,I_; , � � � I I HEAD, 165°F RATING UNDER MEZZANINE � � PHASE II DEMOLITION. <br /> I I ��� � � � � �NP•) SPRINKLER SYSTEM � I <br /> I � � � � � ' � �'�' � I i I I � li <br /> �---� —� � I I , I 8'-0"AFF � <br /> ! � I � I - =--; Ili i I � I � � � � I <br /> � � � I ; � _ �--__' ,li I , � � <br /> � � i � � � IiF� � -�, i � i � I � � � � � II � <br /> � � � I � � � �- ��� --'i � � I ' , 1 1/4" INSPECT I l I � � ; ��' I I O <br /> i � �C I-- i I ORS I � , �- 1 I I <br /> � ' i � j ,����,--��! �----- � �I � I � � TESTS �ROM TRUS� � � I � II-- I I � <br /> � � � � � � � I � � �' � LEVEL S��E DWG. � � � � � � _ I I � � <br /> � , � i _ � ____ � � � I CWM507 � � , � ��-� REFERENCE DRAWIN � <br /> � , � , � � � � - � � �! � i � � � -------- � i � � � GS � <br /> _- ; � , , ���- �-- ,�� _ _ � , � � � � , , <br /> �� ! � � � � -- -- �� ; � - - -�� ; , � , � � � � I � I <br /> � � __ � ,�� _ — ! — � - - � I /�� � � � <br /> ;����'`� - - - � - _ rl �`�. _ -_ ;� _���--� ---��� i � � , \ � �-� , � ` ' �� � � <br /> � I <br /> il � i � a � ��� <br /> � ���- � --- — � - - - --�-`�1'�� �, _ _ - - - - = -- -� - - - - - - = <br /> i i r���� N <br /> � -- — - — -- -- <br /> -- �— �f-- -L - - --' \'�I�� J $,� HUB DRAW ` � u/ ' ';''� <br /> (REF) <br /> �; � - - - - - - - - - - - ���-� <br /> I <br /> � � I � „ ,,, BLDG 40•034 <br /> � �— 12 13 14 15 16 17 <br /> K �� K <br /> �' L _10 � 11 L � <br /> 13 � 14 � <br /> L3 � � ' � I L3 <br /> BLDG I I <br /> 40-025 16 ( 17 � <br /> �., - - -� - �.� <br /> 19 � 20 � <br /> M � �q <br /> 22 23 <br /> N N <br /> it it' 12 13 14 15 i6 11 <br /> BLDG 40-036 <br /> BUILDING 40-035 KEY PLAN <br /> NTS N <br /> 0 4' 8' 16' 24' <br /> 1/8"=1'-0„ <br /> PARTIAL FIRST FLOOR FIRE PROTECTION PLAN <br /> SCALE: 1/8"=1'-0° N <br /> wv,iw.brph.com Copyright o 2016 <br /> �S i c o n s u I�i n g e n g i n e e r s �-chitects En�i neers Constructors <br /> Seattle, Washington > > <br /> " 19020 33rd Ave W,Suite 530 State of Washington <br /> . Lynnwood,Washington,98036 Certificate of Authorization <br /> p,, 425-921-3500 Architecture No.603235512 � <br /> �U�u ��U��� CX, S C—'rV I C-C' Engineering No.3137 n <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY ��WN DATE SUBTITLE REMOVAL PA CURRENT REVISION SYMBOL DATE � <br /> � �an�,� DGD 07(27/16 RTIAL FIRST FLOOR � <br /> 0 Release 8-IFC Wing Body Join-(WBS16321}(25-35) FSi REG 07127116 d <br /> '`� F o� 'J�^sy, �p THIS DESIGN ANDIOR CHECKED �632� 0 O7/27/16 <br /> ��F���� � ?�f � SPECIFICATION ISAPPROVED KMC o7�2�r,6 FIRE PROTECTION PLAN SHEET � <br /> m � ' � ENGINEER TITLE FACTORY TRANSFORMATION 777x Win Bod Join " <br /> BOE,�� � � APPROVED BY DEPT. DATE KRL 07127/16 9 Y � <br /> .� �,;T��� ; CHECKED 1 M260-22 R -800 � <br /> '� �` APPROVED B V I LD 1 N G TO-035 ,106 NO. COMP NO. c <br /> FSS�ONAL ENG <br /> W015i2899-800 � <br /> �;,,,; APPROVED MECHANICAL MASTER COL 11-13/M-N EVERETT, WA °WGNO. 40-035-1M260-22R-800 c <br /> SIG�Vf 0 <br />