GENERAL EQUIPMENT NOTES: BAR / PREP EQUIPMENT
<br /> 1. ALL WORK RELATING TO THE INSTALLATION AND HOOKUP OF THE SPECIFIED EQUIPMENT IS TO BE • � �
<br /> PERFORMED IN FULLACCORDANCE WITH APPLICABLE CITY, COUNTY, LOCAL, STATE AND FEDERAL CODES AND LABEL QTY EQUIPMENT/ ITEM MANUFACTURER /VENDOR SERIES MODEL No. UTILITY WATER/DRAIN* SIZE (WxDxH) NOTES
<br /> ALL OTHER GOVERNMENTAL REGULATORY REQUIREMENTS.
<br /> 2. THESE PLANS ARE PREPARED AND FURNISHED FOR THE PURPOSE OF INDICATING EQUIPMENT SERVICE E-01 1 ESPRESSO COFFEE MACHINE LA MARZOCCO LINEA PB 2-GROUP 220 VOLT 30A IDW, 28"x 23"x 21"
<br /> REQUIREMENTS AND ROUGH-IN SPOTTING LOCATIONS ONLY AND DO NOT RELIEVE THE GENERAL E-02 2 COFFEE GRINDER NUOVA SIMONE�LI MYTHOS ONE CLIMA PRO 110 VOLT - 8"x 17"x 20"
<br /> CONTRACTOR, SUB-CONTRACTORS, OR OTHER INVOLVED TRADES OF THE RESPONSIBILITY TO CONSULT WITH
<br /> THE DESIGNER, OWNER OR HIS REPRESENTATIVE CONCERNING ALL OTHER REQUIREMENTS OF THE Pierce Design
<br /> BUILDING. E-03 1 COFFEE GRINDER MAHLKONIG SHOP GRINDER EK43 115 VOLT - 9"x 16.1"x 30.3" 2300 W Com modore Way
<br /> Suite 201
<br /> 3. ALL MISCELLANEOUS PARTS AND ITEMS INCLUDING GREASE TRAPS, GREASE INTERCEPTORS, FAUCETS, E-04 1 ESPRESSO KNOCK BOX 6"x 6"x 4" Seattle, WA 98199
<br /> VALVES, TRAPS, TRIM, WIRING, MAGNETIC STARTER, DISCONNECTS, ELECTRICAL PANELS, THERMAL
<br /> OVERLOAD PROTECTION, CORDS, AND PLUGS, ETC. ARE SUPPLIED BY THE APPROPRIATE SUB-CONTRACTOR E-05 1 COFFEE BREWING SYSTEM FETCO DUAL STATION, 1 GALLON CBS-2132XTS 200-240 VOLT 3/8" MALE FLARE 19-3/4"x 20-3/8"x 27-3/4"
<br /> UNLESS OTHERWISE SPECIFIED ON THESE PLANS OR BY SEPARATE WRITTEN CONTRACT.
<br /> 4. P�UMBING, ELECTRICAL,AND REFRIGERATION ROUGH-IN AND FINAL CONNECTIONS AND HOOK-UP SHALL E-06 2 AIRPOTS THERMAL DISPENSER FETCO 1.0 GALLON LUXUS L3D-10 - 8"x 10-1/4"x 13-5/16" PPO'ect Contact �
<br /> BE PROVIDED AND PERFORMED BY THE RESPECTIVE SUB-CONTRACTORS IN COMPLIANCE WITH APPLICABLE �
<br /> NATIONAL, STATE,AND LOCAL CODES. ALL ROUGH-INS ARE SUBJECT TO CHANGE AND VERIFICATI(�N PENDING E-07 1 CARBONATOR MCCANN BIG MAC 2 GALLON 115V Wesley Pierce
<br /> THE FINAL SELECTION AND LOCATION OF ALL EQUIPMENT. W@S C W@Spl2t'C@.COI'Yl
<br /> E-08 1 UNDERCOUNTER REFRIGERATOR (ADA HEIGH� TRUE UNDERCOUNTER True ADA-48-HC 115V - 48 318"x 30 1/8"x 35 15I16" Tei: (206) 792-9396
<br /> 5. THE GENERAL CONTRACTOR SHAL� PROVIDE AND INSTALL THE PROPER BACKING FOR WALL AND
<br /> CEILING MOUNTED EQUIPMENT, SHELVING, BRACKETS, BRACES, TABLE CANTILEVER BASES, STOOL E-09 1 UNDERCOUNTER FREEZER (SHALLOW DEPTH) TRUE FOOD PREPARATION TUC-24F-HC 115l60/1 - 24"x 24 3/4"x 32 5/8"
<br /> CANTILEVER BRACKETS, HAND RAILING, ETC. AS REQUIRED AND INDICATED ON THE DESIGNER'S PLANS 8�
<br /> SPECIFICATIONS AND AS DIRECTED BY THE OWNER. 69 1/8"x 28 1/8"x 37" (52 1/4"
<br /> E-10 1 UNDERCOUNTER REFRIGERATOR/KEG TAPS TRUE UNDERCOUNTER KEGERATOR TDD-3 115v - WITH TAPS INCLD.)
<br /> 6. ALL ITEMS NOTED °EXISTING, FUTURE, BY OTHER, AND NIC (NOT W CONTRACT)" SHALL BE VERIFIED BY
<br /> THE RESPECTIVE SUB-CONTRACT�R FOR SIZE AND REQUIREMENTS PRIOR TO ROUGH-IN AND FINAL E-11 1 SANDWICH PREP FRIDGE TURBO AIR J SERIES JST-36 115V - 35 3/8"x 28 1/2"x 41 5/8"
<br /> CONNECTION.
<br /> 7. THE GENERAL CONTRACTOR SHALL PROVIDE NON-COMBUSTIBLE, ONE (1) HOUR-RATED (MINIMUM) E-12 1 UPRIGHT REFRIGERATOR TURBO AIR M3 SERIES M3R47-2 115V - 52 3/4"x 32 3/4"x 83" ,
<br /> WALL(S) BEHIND AND ADJACENT TO COOKING EQUIPMENT AS REQUIRED BY NATIONAL, STATE, AND LOCAL
<br /> CODES AND ORDINANCES. E-13 1 CONVECTION OVEN MOFFAT TURBOFAN E22M3 110 VOLT - 24"x 23 7/8"x 22"
<br /> PROJECT ADDRESS
<br /> 8. THE GENERAL CONTRACTOR SHALL PROVIDE FLOOR, WALL, CEILING, AND ROOF PENETRATtONS, FIRE- E-14 1 PANINt PRESS WARING TOSTATO WFG250 120V - 16"x 17 1/2"x 9 1/2�� 2927 Wetmore Avenue
<br /> RATED SHAFT(S) FOR EXHAUST DUCTING, SHAFT(S) FOR MAKE-UP AIR DUCTING PVC AND SLEEVES FOR
<br /> REFRIGERATION, SYRUP, INERT GASES, BEER AND WINE LINE(S) TO ACCOMMODATE THE REQUIREMENTS AND E-15 1 WAFFLE IRON KRAMPOUZ WECCHCAS L.iege-Style 120V 12a - 22 5/8"x 20"x 11 5/16" Everett, WA 98201
<br /> PROPER INSTALLATION OF ALL FOOD SERVICE EQUIPMENT.
<br /> 9. IT SHALL BE THE RESPONStBILITY OF THE GENERAL CONTRACTOR TO PROVIDE WEATHER PROTECTION E-16 1 COUNTERTOP MIXER KITCHENAID COMMERICAL COUNTERTOP MIXER KSM8990DP 115V -
<br /> FOR ALL ROOF, FLOOR AND WALL PENETRATIONS PRIOR TO AND DURING THE INSTALLATION OF THE FOOD
<br /> SEVICE DEALER'S EQUIPMENTAND FURNISHINGS. E-17 1 COUNTERTOP INDUCTION BURNER EUERODIB COUNTERTOP INDUCTION P3D 115V CW& HW
<br /> 10. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO PROPERLY SEALALL FLOOR, ROOF E-18 UNUSED
<br /> AND WALL PENETRATIONS AS REQUIRED AFTER THE INSTALLATION OF THE FOOD SERVICE DEALER'S
<br /> EQUIPMENTAND FURNISHINGS.
<br /> E-19 2 POINT OF SALE (POS) APPLE IPAD/SQUARE -
<br /> 11. ALL DIMENSIONS SHOWN ON THESE PLANS ARE MEASURED FROM FINISHED WALLS, FL.00R, CEI�ING,
<br /> AND/OR EDGES OF UTILITY ROUGH-INS. THE SUB-CONTRACTORS SHALL MAKE NECESSARY ALLOWANCES FOR E-20 4 CUP DISPENSERS SAN JAMAR EZ FIT C2410CBK - 23 1/4" D X 5 3/4" DIA
<br /> FINISHES DURING ROUGH-IN AS REQUIRED. �
<br /> 12. ALL PLUMBING OUTLETS AND REQUIREMENTS SHOWN OIV PLANS ARE THE FIXTURES AND EQUIPMENT E-21 1 MICROWAVE TBD 7BD TBD TBD - TBD
<br /> SPECIFIED AND AS FURNISHED BY THE KITCHEN EQUIPMENT CONTRACTOR, UNLESS OTHERWfSE NOTED. FOR
<br /> ANY ADDITIONAL BUILDING PLUMBING REQUIREMENTS, SEE OTHER PLANS.ALL DIMENSIONS GIVEN ARE FROM E-22 1 UNDERCOUNTER REFRIDGERATOR (SHALLOW DEPTH) TURBO AIR J SERIES JUR48 115V - 47 1/4"x 23 5/8"x 33 3/4"
<br /> THE FINISHED WALLS. ELEVATIONS GIVEN ARE FROM THE FINISHED FLOOR.
<br /> 13. PLUMBER TO CONNECT ALL WATER LINES, GAS LINES, WASTE LINES, ETC. CONNECT INDIRECT WASTES �
<br /> FROM EQUIPMENT (DRAIN BOARDS, QUICK DRAINS, ICE BINS, DIPPER WELLS, ETC) TO THE NEAREST AND
<br /> MOST ACCESSIBLE FLOOR OR HUB DRAIN. DO NOT RUN WASTES SO AS TO INTERFERE WITH THE OPERATION BAR / PREP PLUMBING EQUIPMENT
<br /> OF BUSINESS OR FUNCTION OF EQUIPMENT. SECURE THE EQUIPMENT TO WALLS (EXCEPT WHERE NOTED).
<br /> 14. PLUMBER TO BRANCH AND CONNECT WHERE REQUIRED AND TO FULLY CONNECT ALL EQUIPMENT AND LABEL QTY EQUIPMENT/ iTEM MANUFACTURER/VENDOR SERIES MODEL No. UTILITY WATER/DRAIN* SIZE (WxDxH) NOTES �
<br /> RUN CONDENSATE LINES FROM UNITS TO DRAINS. LINES TO BE NO SMALLER THAN THE STUB OUT OF THE
<br /> FIXTURE. FOR SPECIFIC TYPE OF CONNECTtON AND LOCATIONS, REFER TO THE EQUIPMENT BROCHURE AND P-01 1 WATER FILTRATION GLOBAL CUSTOMIZED WATER EASY 24"x 18"x 29 1/2"
<br /> DRAWINGS. �
<br /> P-02 1 DISHWASHER AUTOCML�R U34 BOOSTED U34 115 V IDW 29"x 22"x 34" 20A DEDICATED CIRCUIT
<br /> 15. PLUMBER TO PROVIDE SHUT-OFF VALVES ON ALL WATER AND GAS LINES,ALL VALVES, CUT OFFS, TRAPS,
<br /> RECOMMENDED
<br /> HYDROSTATIC SMOCK ELIMINATORS, PRESSURE REGULATORS AND MATERfAL NECESSARY TO CONNECT ALL 3�s^ICE MAKING INLET, �
<br /> LINES UNLESS OTHERWISE SPECiF1ED ON THE SPECIFICATIONS. UR-0140A- REGULAR SIZE �i2"FPT CONDENSOR
<br /> P-03 1 ICE MACHINE MANITOWOC UNDERCOUNTER CUBES 110 VOLT OUTLET,3is°FPT 26"x 28"x 38.5"
<br /> „ CONDENSOR INLET,1/2" �
<br /> 16. ALL FLOOR DRAINS ARE TO BE SET 1/2 BELOW FINISHED FLOOR, UNLESS OTHERWISE NOTED. DO NOT FPT ICE BIN DRAIN
<br /> SLOPE FLOORS SO CLOSE TO DRAINS AS TO CREATE "PITS" OR "DIPS" IN FLOOR. MINIMUM RADIUS OF SLOPE
<br /> TO BE 24" FROM CENTERLINE OF DRAIN. P-04 1 UNDERCOUNTER BOILER MARCO ECOSMART UC4 230 VOLT 3/4" BSP 9.8"x 18.5"x 10.7"
<br /> 17. PLUMBING CONTRACTOR IS REQUIRED TO FURNISH AND INSTALL ALL PLUMBING COMPONENTS p-05 1 PITCHER RINSERS ESPRESSO PARTS - SIDE SPRAY - IDW 24"x 7" x 7/8"
<br /> NECESSARY TO PROVIDE SERVICE TO LOCATIONS AND EQUIPMENT AS SHOWN IN THE PLAN UNLESS NOTED
<br /> OTHERWISE.
<br /> P-06 1 PITCHER RINSERS ESPRESSO PARTS - SIDE SPRAY - IDW 15" x 7" x 7/8"
<br /> 18. CONTRACTOR TO CONFIRM POWER, GAS AND PLUMBING REQUIREMENTS WITH ALL ELECTRICAL,
<br /> MECHANICAL,AND PLUMBING DRAWINGS AND CONSULTANTS. P-07 1 ICE WELL APW WYOTf - CFW 1 D - IDW 15"X 23"X 7 3/4°
<br /> 19. ALL SINKS TO HAVE ROUNDED INSIDE CORNERS. P-08 1 GLASS FILLER FAUCET T&S WATER STATlON W/DRAIN B-1230 - CW, IDW 10 1/2"x 12 5/8"x 9 3/8"
<br /> 20. IF HIGH MINERAL CONTENT IN THE WATER SUPPLY EXISTS, IT IS RECOMMENDED THAT A WATER
<br /> SOFTENER FILTER AND/OR DEIONIZER SEPARATOR BE USED IN THE FINAL PLUMBING CONNECTIONS TO P-09 1 BUBBLY WATER DISPENSER FOXX GOOSENECK DRAFT SODA 12CO3-105 - CW ISSUE
<br /> CONDENSING UNITS, STEAMERS, COFFEE MAKERS, WATER HEATERS AND SIMILAR ITEMS OF KITCHEN
<br /> EQUIPMENT. P-10 1 DUMP SINK REGENCY - DW 13"x 19"x 10" December 16, 20�6
<br /> 21. THE CONTRACTOR IS TO PROVIDE ALL FAUCETS, DRAIN OUTLET FITTINGS IN FIXTURES AND SPECIALTY P-11 1 DUMP SINK FAUCET - CW& HW PHASE
<br /> ITEMSAS OUTLINED IN THE SPECIFICATIONS. P@CCTIIt DOCIlCTI@fltS "
<br /> 22. OMISSIONS AND/OR ERRORS IN SCHEDULE DO NOT RELIEVE THE PLUMBING CONTRACTOR FROM p-'12 2 HAND SINK REGENCY - SEHS17 - DW 17"x 15°x 5"
<br /> COMPLETE AND CORRECT FINAL CONNECTIONS RESPONSIBILITY. HIS/HER REVIEW OF EQUIPMENT BROCHURE
<br /> BOOK AND DRAWINGS,ARE TO ASSURE CORRECTNESS OF HIS/HER WORK. P-13 1 3-COMPARTMENT SINK REGENCY - 88" (16"x 20"x 12" bowls) - IDW 88"x 25 1/2"x 44 3/4" REV. DATE REMARKS
<br /> 23. FAILURE TO COMPLY WITH THESE NOTES COULD VOID OR CANCEL MANUFACTURERS' WARRANTIES. IF p_14 1 3 COMP FAUCET T&S EQUIP 5PR-8W12 - CW& HW 8" CENTERS, 35 3/4" H
<br /> THERE IS DOUBT AS TO THE PROPER INTERPRETATION OR ACTION THAT IS INTENDED, CONTACT THE
<br /> DESIGNER OR OWNER IMMEDIATELY. VERIFY WITH DESIGNER OR OWNER, FINAL EQUIPMENT REQUIREMENTS
<br /> BEFORE ORDERING MATERIAL. P-15 1 FOOD PREP SINK REGENCY 1-COMP 304 S/S - IDW 38 1/2"x 23 1/2"x 36"
<br /> P-16 1 PREP FAUCET REGENCY WALL MOUNT 8"CENTERS - - 8" NECK, 5" H
<br /> P-17 1 MOP SINK REGENCY - 600sm16206 - DW 24"x 24"x 10"?
<br /> P-18 1 MOP SINK FAUCET REGENCY - 600fms86 - CW& HW 8" CENTERS, 6 1/2" NECK, 14" H w/vacuum break
<br /> P-19 4 FLOOR SINK p�/
<br /> BATHROOMS
<br /> LABEL QTY EQUIPMENT/ ITEM MANUFACTURER J VENDOR SERIES MODEL No. UTILITY WATER/DRAIN* SIZE (WxDxH) NOTES EQ U I P M E NT &
<br /> P-20 2 TOILET EXISTING P L U 1 V 1�I N G
<br /> P-21 2 SINK EXISTING S C H E D U L E S �
<br /> �
<br />
|