Laserfiche WebLink
Section 3: Should costs be less for the above projects than originally estimated, <br /> projects receiving the next highest neighborhood priority shall be included for funding. <br /> If project costs exceed the estimates given, the lowest priority project or projects will <br /> be dropped for funding. <br /> Section 4: If any of the above projects is started but not completed, completion of the <br /> project (s) will be automatically funded with any 1983 Block Grant funds received by <br /> the neighborhood where an uncompleted project is located. <br /> Section 5: All of the above projects shall conform to the requirements of the City <br /> Ordinance 555-78, as amended by City Ordinance's 655-80 and 793-81. Determination <br /> of the appropriate standards to impose shall be made by the City Engineer. <br /> Section 6: The total estimated cost of the improvements herein authorized is $167,230 <br /> which will include all costs related to design, construction, contract administration, <br /> plan development and associated costs. <br /> Section 7: The City Engineer of the City of Everett under the administration of the <br /> Mayor is hereby given the responsibility of providing for the improvements as defined <br /> herein. <br /> Section 8: The City Treasurer of the City of Everett is hereby authorized to negotiate <br /> a reasonable rate of interest and issue interest bearing warrants to satisfy interim <br /> construction costs not to exceed $167,230. These interest bearing warrants shall be <br /> redeemed by the Treasurer as soon as reimbursement or long term bond financing <br /> monies, as described elsewhere in this Ordinance, are received. <br /> Section 9: <br /> A. The sum of $167,230 is hereby appropraited to Fund No. 354, "1982 Block Grant <br /> Neighborhood Improvements", as follows: <br /> Program 181: Block Grant Northeast Everett Neighborhood <br /> Improvement SUBTOTAL $64,371.00 <br /> Program 183: Block Grant Port Gardner Neighborhood <br /> Improvement <br /> Program 196: Wheelchair Ramps-Pacific & Norton <br /> Program 197: Wheelchair Ramps-Wetmore & 32nd <br /> Program 198: Port Gardner Neighborhood Traffic Study <br /> Program 199: Engineering & Design of Port Gardner <br /> Neighborhood Improvement Projects <br /> Program 223: Port Gardner Neighborhood <br /> Community Organizing <br /> Program 224: Port Gardner Attic Insulation Project <br /> Program 225: Port Gardner Inventory of Historic Properties <br /> Program 226: Port Gardner Neighborhood Tree Planting Project <br /> Program 227: Port Gardner Health Path Construction <br /> SUBTOTAL $64,371.00 <br /> Program 228: Lowell Refuse Clean-Up Project <br /> Program 229: Lowell Rodent Control Project <br /> Program 230: Lowell Bicycle Lane Construction <br /> Program 231: Lowell Historical Marker Project <br /> Program 232: Lowell Historical Souvenir Project <br /> Program 233: Lowell Attic Insulation Project <br /> Program 234: Lowell Historical Structure Renovation Project <br /> Program 235: Lowell Neighborhood Community Organizing <br /> Program 236: Lowell Groundwater Drainage <br /> Home Improvement Program <br />