My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 860-82
>
Ordinances
>
Ordinance 860-82
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2018 10:23:15 AM
Creation date
6/7/2018 10:23:12 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
860-82
Date
5/12/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Allocate $500.00 to make and place markers on historically significant <br /> buildings in Lowell. <br /> 5. Allocate $500.00 to develop historic building calendars, pictures, etc. for <br /> sale. <br /> 6. Allocate $4,000.00 for attic insulation in low income homeowners' <br /> residences. <br /> 7. Allocate $20,000.00 to restore outside facades of historic structures such <br /> as the Lowell Church or Fire Hall. Money will be repaid for restoration of <br /> other Lowell buildings. <br /> 8. Allocate approximately $3,000.00 to Council for a Greater Everett for <br /> community organizing and work on neighborhood issues. <br /> 9. Allocate approximately $9,000.00 for groundwater drainage home <br /> improvement program to low income homeowners. <br /> 10. Allocate approximately $3,600.00 to install guardrail at 52nd Street and S. <br /> 3rd Ave. <br /> 11. Engineering and design of neighborhood improvement projects. <br /> B. Northeast Everett Neighborhood Improvements <br /> 1. 1100 Block of Maple - curb, gutters, sidewalks, drainage, and street overlay <br /> (estimated project cost: $50,000.00). <br /> 2. Southern most 200 feet of 1800 block of Chestnut adjacent to 19th - paved <br /> and curbs on both sides and sidewalk on west side (estimated project cost: <br /> $25,000.00). <br /> 3. Engineering and design of neighborhood improvement projects. <br /> C. Port Gardner Neighborhood Improvements <br /> 1. Install eight wheelchair ramps at Pacific and Norton Avenue intersection. <br /> Estimated cost: $1,600.00 <br /> 2. Install eight wheelchair ramps at Wetmore and 32nd Street intersection. <br /> Estimated cost: $1,600.00 <br /> 3. Allocate $3,000.00 to Council for a Greater Everett for community <br /> organizing and work on neighborhood issues. <br /> 4. Allocate $5,000.00 for attic insulation and weatherstripping in low income <br /> homeowners' residences. <br /> 5. Complete inventory of historic properties in Port Gardner. <br /> Estimated cost: $5,000.00 <br /> 6. Plant trees in publicly-owned areas throughout the neighborhood. <br /> Estimated cost: $2,500.00 <br /> 7. Construct new curb, gutter, and sidewalk on both sides of 4000 block of <br /> Friday, widen roadway to 28 feet to allow parking on one side of block. <br /> Estimated cost: $54,000.00 <br /> 8. Construct health path, possibly from Doyles Park to Jackson Playfield. <br /> Estimated cost: $12,000.00 <br /> 9. Neighborhood traffic study, (only if study is not done by City of Everett <br /> Transportation Department). <br /> 10. Engineering and design of neighborhod improvement projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.