Laserfiche WebLink
• <br /> • <br /> • <br /> C. Riverside Neighborhood Improvements <br /> 1. Replace sections of sidewalk on Highland between 23rd and Everett <br /> Avenue. The following segments are suggested ($8,600) <br /> a. Highland between 23rd and 24th (east side). <br /> (1) 8' sidewalk replaced in front of 2301 Highland. <br /> (2) 184' sidewalk replaced in front of 2305 Highland extending <br /> through 2311 and 2317 Highland. <br /> (3) 58' sidewalk replaced in front of 2329 Highland. <br /> b. Highland between 24th and 25th (east side). <br /> (1) 60' sidewalk replaced in front of 2423 Highland. <br /> (2) 50' sidewalk replaced in front of 2427 Highland. <br /> (3) 225' sidewalk replaced south of 2427 to freeway fence. <br /> c. Highland between 23rd and 24th (west side). <br /> (1) 85' sidewalk replaced in front of 2306 Highland including <br /> vacant area at corner; rest of block ok. <br /> d. Highland between 25th and 26th (west side). <br /> (1) 260' sidewalk replaced in front of house by freeway (no <br /> number). Curbs may be needed. <br /> 2. Install concrete curb and gutter and off-street parking on 24th Street <br /> from Walnut to State Street as outlined in the Garfield Park Master <br /> Plan. ($27,800) <br /> 3. Replace broken sidewalk as needed on the east side of Walnut from <br /> 20th to 22nd Street. ($5,000) <br /> 4. Replace approximately 165 feet of sidewalk and construct a drainage <br /> system to intercept ground water flow on the west side of Maple from <br /> 19th Street to Victor Place. (4,700) <br /> 5. Allocate funds to the Council for a Greater Everett to provide <br /> support services to the Riverside Neighborhood. ($1,000) <br /> 6. Replace sidewalk segment in front of 2301 and 2305 Virginia. ($1,100) <br /> 7. Replace sidewalk segment in front of 2414 Baker. ($550) <br /> 8. Replace sidewalk segment in front of 2524 Maple. ($900) <br /> D. Port Gardner Neighborhood Improvements <br /> 1. $1,000 to Council for Greater Everett for neighborhood fair share <br /> assistance for support services to Port Gardner neighborhood. <br /> 2. Terrace Drive (43rd Street to 44th Street), concrete curb and gutter <br /> on both sides, install storm drainage system, landscaping behind curb, <br /> asphalt resurfacing. ($42,500) <br /> 3. 43rd Street (alley west of Rucker Avenue to Grant Avenue) construct <br /> concrete curb and gutter on north side of 43rd, install storm drainage <br /> system. ($14,160) <br /> 4. $500 to Jackson Elementary School PTA towards estimated $2,400 <br /> playground equipment to be purchased by PTA. <br /> 5. Terrace Drive (42nd Street to 41st Street), concrete curb and gutter <br /> on west side, install storm drainage system, asphalt resurfacing. <br /> ($34,150) <br /> - 4 - <br />