My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2108 RUCKER AVE 2018-06-08
>
Address Records
>
RUCKER AVE
>
2108
>
2108 RUCKER AVE 2018-06-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 9:10:59 AM
Creation date
6/8/2018 9:10:40 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2108
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
into a six unit multi-family structure,and to construct a rear yard infill duplex with a zero foot <br /> setback from the rear lot line and a roof pitch of either two to twelve vertical to horizontal ratio <br /> for a shed style roof or five to twelve vertical to horizontal ratio for a hip style roof. <br /> da, - 'Foe. 4.6%. 2"S Taisc rvYl SSS... %vita <br /> Allan -' :-�lr irector Date <br /> Planning and Community Development Department <br /> This is an administrative decision that may be appealed to the City's Land Use Hearing <br /> Examiner. An appeal must be filed with the City within 14 days of the date of this notice. If you <br /> have questions regarding this proposal or if you wish to file an appeal, please contact Niels <br /> • Tygesen,City of Everett Planning Department,at 425.257.8731. <br /> If a complete building or construction permit application has not been filed within 18 months <br /> from the approval date of this decision, this decision shall be deemed terminated, unless an <br /> extension is requested prior to that expiration date, in which case the Planning Director may <br /> approve an extension up to 6 months. <br /> INFORMATION FOR DEVELOPER: <br /> The following information is provided for the developer's benefit. All requirements are <br /> preliminary in nature, and are based upon the preliminary site plan and the ordinances in effect at <br /> time of submittal for this project review. The proposal must comply with all ordinances in <br /> effect at the time a complete building permit application is filed,including those not <br /> specifically set forth herein. Contact the Planning Department for information regarding <br /> appeals processes for the requirements listed in this document. <br /> 1. This project requires construction permits and final inspections by the City of Everett. <br /> Final approvals are required by the City prior to occupancy. <br /> Niels Tygesen—Planning Department Comments—425.257.8731 <br /> 1. Any change to approved plans and drawings will require review by the Planning Department. <br /> 2. The property is not listed on any designated historic register. To list the property on a historic <br /> register,please contact Planning Department staff or a member of the Historical <br /> Commission. <br /> Benyam Stephanos--Engineering/Public Works Department Comments—425.257.8810 <br /> A review of this project by the Engineering/Public Works Department indicates that the <br /> following conditions should apply: <br /> Planning Director Decision Page 3 of 7 <br /> HC 16-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.