Laserfiche WebLink
development and design. This includes underground hazardous liquid and gas <br /> transmission pipelines located within the project area and in the vicinity. <br /> No existing hazardous chemicals or conditions are present that might affect Project <br /> development and design. <br /> 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced <br /> during the project's development or construction, or at any time during the <br /> operating life of the project. <br /> No toxic or hazardous chemicals will be stored, used, or produced during the Project's <br /> development or construction, or at any time during the operating life of the Project. <br /> 4) Describe special emergency services that might be required. <br /> No special emergency services will be required for the Project. <br /> 5) Proposed measures to reduce or control environmental health hazards, if any: <br /> The contractor will implement the following BMPs to reduce or control environmental <br /> health hazards: <br /> • All applicable permits for the Project will be obtained prior to construction. All work <br /> will be performed according to the requirements and conditions of these permits. <br /> • Erosion control measures will be addressed in a Temporary Erosion and Sediment <br /> Control Plan prepared by the contractor and adhered to during construction. <br /> • All equipment to be used for construction activities will be cleaned and inspected <br /> prior to arriving at the Project site to ensure no potentially hazardous materials are <br /> exposed,no leaks are present, and the equipment is functioning properly. <br /> Washington State Department of Ecology (DOE) approved BMPs for handling <br /> contaminated material should it be encountered, will be implemented under the MTCA <br /> program already in place for the site. <br /> b. Noise <br /> 1) What types of noise exist in the area which may affect your project (for example: <br /> traffic,equipment, operation, other)? <br /> No noise exists in the area that may affect the Project. <br /> 2) What types and levels of noise would be created by or associated with the project on <br /> a short-term or a long-term basis (for example: traffic, construction, operation, <br /> other)?Indicate what hours noise would come from the site. <br /> The noise associated with the Project would be temporary in nature and occur for a short <br /> duration. Activities would be conducted during the daylight hours per Everett Municipal <br /> Code (EMC) 20.08.100(B)(4). The noise associated with the proposed activity would not <br /> be unlike normal noises associated with existing activities at the South Terminal. Per <br /> EMC 20.08.100(B)(4), noise emanating from marine-oriented construction sites is <br /> exempt from the noise code except between the hours of 10 p.m. and 7 a.m. <br /> 3) Proposed measures to reduce or control noise impacts, if any: <br /> No impacts are anticipated; therefore, no measures are proposed. The proposed activities <br /> are only anticipated to occur for a short period of time and will only occur during <br /> allowable hours per EMC 20.08.100(B)(4). In the event noise concerns arise, the Port <br /> Port of Everett—Marine Terminal Rail Upgrades c� <br /> SEPA Environmental Checklist(WAC 197-11-960) a e 10 <br />