Laserfiche WebLink
maintains a Noise Compliant Hotline (425-388-0269) that is monitored 24 hours per day, <br /> 7 days per week. <br /> 8. LAND AND SHORELINE USE <br /> a. What is the current use of the site and adjacent properties? Will the proposal affect <br /> current land uses on nearby or adjacent properties? If so,describe. <br /> The Port's marine terminals and surrounding properties have been occupied by industries <br /> such as lumber mills, pulp and paper mills, lumber storage, wire and nail production, and <br /> shipping and military activities (including the Navy Homeport facility) for more than 100 <br /> years. Port Gardner Bay, located in Possession Sound, is a major shipping route for bulk and <br /> containerized cargo. In addition to industry, the bay is used for fishing, recreation, and <br /> wildlife habitat. <br /> b. Has the project site been used as working farmlands or working forest lands? If so, <br /> describe. How much agricultural or forest land of long-term commercial significance <br /> will be converted to other uses as a result of the proposal, if any? If resource lands have <br /> not been designated, how many acres in farmland or forest land tax status will be <br /> converted to nonfarm or non-forest use? <br /> The Project area has not been used as working farmlands or forestlands. <br /> 1) Will the proposal affect or be affected by surrounding working farm or forest land <br /> normal business operations, such as oversize equipment access, the application of <br /> pesticides,tilling, and harvesting? If so,how: <br /> The Project will not affect or be affected by surrounding working farm or forest land <br /> normal business operations. <br /> c. Describe any structures on the site. <br /> The Project area comprises portions of the Port's South Terminal, Pacific Terminal, and <br /> Hewitt Terminal. Structures at the property are typical to those used for marine shipping <br /> operations including warehouses, offices, and cranes. <br /> d. Will any structures be demolished? If so,what? <br /> No structures will be demolished as part of the Project. <br /> e. What is the current zoning classification of the site? <br /> The current City of Everett zoning classification of the site is M-2 Heavy Manufacturing. <br /> f. What is the current comprehensive plan designation of the site? <br /> The current City of Everett comprehensive plan designation of the site is 5.1 Heavy <br /> Industrial (City of Everett 2015). <br /> g. If applicable,what is the current shoreline master program designation of the site? <br /> The portion of the site within the Shoreline Overlay District is designated by the City of <br /> Everett Shoreline Master Plan as Urban Deep Water Port(City of Everett 2011). <br /> h. Has any part of the site been classified as a critical area by the city or county? If so, <br /> specify. <br /> Port of Everett—Marine Terminal Rail Upgrades \' <br /> SEPA Environmental Checklist(WAC 197-11-960) )3) ) <br />