Laserfiche WebLink
Port of Everett <br /> Terminal Rail Upgrades - Phase 1 <br /> City of Everett Design Review Comments <br /> Last Revised:7/23/2015 (A.Patterson) <br /> Bid Set Review Comments - 7/15/15 <br /> Plans <br /> Sheet Detail Reviewer Reviewer Comments M&N Response <br /> Initials <br /> If sewer bypass is required, COE will provide design <br /> flows for temporary bypass. Note that this is a <br /> combined sewer so flows will be higher in wet-weather <br /> conditions. Contractor will be required to design sewer <br /> bypass. Note any bypass requirements in the <br /> drawings/spec. COE can provide some standard <br /> language for sewer bypassing which will need to be The existing SSFM will not be relocated following <br /> General COE customized for this situation. discussion with COE and revising the design. <br /> Submit original redline drawings along with revised <br /> drawings addressing COE comments to permit counter <br /> General COE with a transmittal to keep permit process moving. The redlines will be returned along with revised plans <br />