Laserfiche WebLink
SEPA ENVIRONMENTAL CHECKLIST <br /> UPDATED 2014 <br /> A. BACKGROUND <br /> 1. Name of proposed project,if applicable: <br /> Port of Everett Marine Terminal Rail Upgrades <br /> 2. Name of applicant: <br /> Port of Everett(Port) <br /> 3. Address and phone number of applicant and contact person: <br /> Applicant Contact: <br /> Graham Anderson, Port of Everett <br /> P.O. Box 538 <br /> Everett, Washington 98206 <br /> Phone: (425) 388-0703 <br /> Email: GrahamA@portofeverett.com <br /> Environmental Consultant: <br /> Heather Page, Anchor QEA <br /> 720 Olive Way, Suite 1900 <br /> Seattle,Washington 98101 <br /> Phone: (206) 903-3346 <br /> Email: hpage@anchorqea.com <br /> 4. Date checklist prepared: <br /> March 10, 2015 <br /> 5. Agency requesting checklist: <br /> The Port is the Lead Agency for State Environmental Policy Act (SEPA) compliance in <br /> accordance with Washington Administrative Code (WAC) 197-11-Q50. <br /> 6. Proposed timing or schedule(including phasing,if applicable): <br /> The Marine Terminal Rail Upgrades (Project) will be constructed in two phases. Phase 1 is <br /> anticipated to start in the summer of 2015 and finish in the fall of 2015. Phase 2 construction <br /> would likely commence the following year and be completed by the end of 2016. <br /> 7. Do you have any plans for future additions, expansion, or further activity related to or <br /> connected with this proposal? <br /> There are currently no future plans for additions, expansions, or further activity related to or <br /> connected with this proposal. <br /> 8. List any environmental information you know about that has been prepared, or will be <br /> prepared, directly related to this proposal. <br /> Port of Everett—Marine Terminal Rail Upgrades <br /> SEPA Environmental Checklist(WAC 197-11-960) 0 <br />