My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2415 11TH ST 2018-06-08
>
Address Records
>
11TH ST
>
2415
>
2415 11TH ST 2018-06-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 3:33:30 PM
Creation date
6/8/2018 3:33:28 PM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
2415
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal rPage 2 -' <br /> Work Specifications <br /> 7. WALL COPING:Install new pre-painted metal parapet wall coping after roofing has been completed. <br /> 8. CLEAN UP: During the course of this work, ROOFCORP shall use all means necessary to maintain the work area in a clean, <br /> safe,and orderly manner. <br /> [D]EXCLUSIONS:Any work not described above, Mechanical Work, Electrical Work,Wood Work, City Permits, Fire department <br /> Permits and WSST. Please note that roofing substrates may require additional testing such as pull out tests for wind up-lift <br /> requirements. Our proposal does not include testing or upgrade to roof covering due to test failure. <br /> [E]PERMIT AND INSPECTION FEES: Customer shall pay all building permit, inspection and/or access fees required plus$75.00 <br /> for issuance costs. Please note that many cities have demolition recycling ordinances and the fees or deposits required are not <br /> included. <br /> [F]EXTRA WORK: If during the work process additional work is discovered,the contractor will immediately notify the owner.Any <br /> extra labor connected with repair work will be billed on a time($74.50 per man hour)and(material plus 20%markup)basis. <br /> [G]TIME FOR STARTING&COMPLETION:To be negotiated upon contract signing.The work to be performed by ROOFCORP <br /> pursuant to this agreement shall be commenced within(#)days from the date of owner approval of this contract or approximately <br /> on(date)and shall be substantially completed within(#)days or approximately on(date)weather permitting. <br /> [H]TERMS&CONDITIONS:This proposal is subject to the attached Terms&Conditions. Because firm prices cannot be obtained <br /> from suppliers, prices are subject to change if not accepted within 30 days. <br /> [I]PAYMENT: Progress billing on the 30th of every month <br /> [J]PRICE: Provide all equipment, labor and materials herein described,for the contract sum of: <br /> TOTAL BID $47,234 <br />
The URL can be used to link to this page
Your browser does not support the video tag.