My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/06/13 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/06/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 9:18:59 AM
Creation date
6/19/2018 9:17:28 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q <br /> Growth Network Plan Outcomes & Supporting Investments <br /> To achieve this vision, Everett Transit must make additional investments beyond the current operating <br /> structure.The vision requires an increase from its current levels in vehicle hours, fleet, operators,and <br /> supporting facilities in order to provide the increase in frequency both in the peak and off-peak periods <br /> identified in the Growth Network Plan. <br /> The Growth Network Plan includes the following: ► Increased frequency on W Casino Road <br /> ► Increased frequency in downtown Everett ► More direct service on Broadway and 19th <br /> ► New service between the Waterfront and Avenue SE <br /> Riverfront areas ► Restructured service to Paine Field and <br /> ► Restructured service in Evergreen and Pinehurst throughout SW Everett to connect to the Mall <br /> to better connect to light rail and Boeing and light rail <br /> ► Restructured Boeing-area service to the Seaway ► Direct service between Mariner light rail station <br /> Transit Center and the Mall <br /> usumammensia <br /> H 1 if, --,^,,''''l 1 J''" I 1110q.if 'i'S7 11111 li-10;:r111 II 11 a5e .a.0 ter. <br /> +LI. <br /> 125% <br /> 1- 6-8 < 10 <br /> minutes wait-time <br /> Bus Schedule 1 IC* <br /> ye* f > y i. g , <br /> Arrive Depart ''7 1 '1/4:11i "1` I J �S V <br /> 5-00 5:05 <br /> 115 5:20 <br /> Up to 25%growth in annual service hours Increase in total fleet from 42 today to Increased frequency,with wait-times on <br /> between 48-50 buses average below 10 minutes as compared to <br /> over 15 minutes today <br /> 1.11 ,., 1 i16R1 41,N14�V kt itla if 1Ul;`ir11 1101 "<sr 0 1 ,Vag)g)t=i �� '�l to , tt�IhCtf,'?ge iiI�Iii�i f�kith <br /> - <br /> 120% 0485% 138 117,000 <br /> l r�' I� -� 1r 1 (, % "� <br /> i <br /> ,_i L <br /> Increase in peak period seated People are willing to walk farther The service is more productive,with Up to 17,000 daily riders estimated <br /> capacity by 20% when transit is more frequent.The up to 38 riders per revenue hour to use Everett Transit by 2040 due <br /> percent of population and jobs in compared to 19 per hour today to land use growth and service <br /> the city within 1/2 mile to transit is <br /> approximately the same as today <br /> 32 Connecting Your Future 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.