My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/06/13 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/06/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 9:18:59 AM
Creation date
6/19/2018 9:17:28 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> Growth Network Plan <br /> The Growth Network will require additional operations and maintenance facilities for the expected increase <br /> in fleet size.Whether this includes an additional base or expansion of an existing base remains to be <br /> determined. Bus storage, layover,comfort stations, and other capital needs will also need to be considered <br /> for this network as service is expanded. <br /> Everett Transit Growth Network <br /> Route Frequency(Peak) <br /> s Marysville <br /> 15-20 Minutes <br /> 30 Minutes �_ i <br /> d <br /> ••••• Commuter Route <br /> .4.• -- <br /> 45-60 Minutes <br /> College . - - • <br /> Stafi`on <br /> Commuter Route Y <br /> l Increased frequency .t-. <br /> in downtown Everett _ i <br /> Lake Stevens <br /> -. .! , New service between <br /> Er '" Waterfront and Riverfront <br /> Restructrured service in Evergreen -•� I Eyetett <br /> and Pinehurst to better conned .•• I . Stadion <br /> light rail and Boeing • <br /> • asst i 1 <br /> mo <br /> I . sc 'f <br /> Restructured Boeing-area service .y M Mukppb !, ,`\ <br /> to the Seaway Transit Center .--�,•, s.+•,..•et it <br /> . e <br /> 03 <br /> ■ Seth Snohomish <br /> Seaway <br /> ■ Transit_. Everett '' <br /> ISii.. <br /> • Center ' <br /> • <br /> • _--- 51 .. _ • More direct service on <br /> • R c- casino R. •- = Broadway and 19th Ave SE J��- <br /> • <br /> • Increased frequency - /. <br /> • on W Casino Rd - <br /> I <br /> (3)!�e t -100111115 i- /�E�201.tte% �s. _100th St SE B� <br /> • t1j <br /> • O <br /> IVlall Transit Center <br /> • Station <br /> • Mukilteo <br /> • s-.. 112th5tSW .` ' © Ferry <br /> Restructured service to Paine Feld " Stiu`th <br /> and throughout SW Everett to EVer,Btta ll6ihSlSE <br /> connect to the Mall and light rail ,. Freeway ® Paine Field <br /> 1. Station "' <br /> `�'- `''1` 4 8th__StSE Ferre Link Station-Representative <br /> • wg a132nd St SE Future Link Light Rail-Representative <br /> • Direct service between Mariner Mariner Commuter Rail(Sounder) <br /> ■ light rail station and the Mall -..—Regional Bus Service <br /> ■ Mff 11`t'sreek '- Ci of Everett <br /> = --.),,A. City <br /> I \ _.. UGA <br /> Miles 2 74 <br /> 9 — o "_/ <br /> 1 14 Everett Transit Draft Long Range Plan 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.