My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7262
>
Resolutions
>
Resolution 7262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2018 9:20:47 AM
Creation date
6/21/2018 9:20:15 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
7262
Date
6/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 2019 To 2024 Six-year Transportation Improvement Program <br /> Interstate <br /> 1. I-5 /Downtown Everett Interchange Access Improvements Local Access and Other Projects(continued) <br /> (Everett Ave.Hewitt Ave.,US 2,Pacific Ave) 1. Bridge Rehabilitation Program (Maintenance) <br /> 2. I-5 / 100th Street SE HOV Access/Undercrossing 2. Annual Pavement Maintenance Program (Maintenance) <br /> 3. NB Everett Mall Way/SB I-5 Onramp 3. Sidewalk repair and replacement (Maintenance) <br /> 4. 1-5/Smith Island Interchange(I-5&SR 529) 4. Pavement marking projects (Maintenance) <br /> 5. I-5/East Marine View Drive Interchange Improvements <br /> 6. 1-5 NB Shoulder Running (US 2 to SR 528) 1. 106th Place SE Improvements (Street) <br /> 7. I-5/ 128th Street Interchange 2. 3rd Avenue SE Improvements (Street) <br /> 8. I-5/ 128th Street HOV Ramps(Mariner Park&Ride) 3. Local Street Improvements (Street) <br /> 9. I-5/ 112th Street Interchange Study 4. Upper&Lower Ridge Rd.Improvements (Street) <br /> 5. Riverfront Site Access Improvements (Street) <br /> Freeways 6. Downtown Streetscape Improvements (Street) <br /> 1. US 2 Improvements(SR 204 to 1-5) <br /> 2. SR 526 Corridor/Hardeson Road Interchange 1. Traffic Signal Central System (Traffic Signals) <br /> 3. SR 526 Extension(1-5 to US 2) 2. Traffic Signal Interconnect (Traffic Signals) <br /> 4. SR 526/Evergreen Way Interchange 3. Traffic Signal Improvements (Traffic Signals) <br /> 5. SR 529/Smith Island Ramps 4. Traffic Sign Improvements (Traffic Signals) <br /> 6. SR 526/40th Avenue W.Intersection Improvements <br /> 1. Neighborhood Block Grants (Neighborhoods) <br /> Principal Arterials 2. Neighborhood Traffic Studies/Project (Neighborhoods) <br /> 1. W.Marine View Dr./Rucker/41st Freight Route Improvements 3. Residential Sidewalks (Neighborhoods) <br /> 2. Broadway Corridor Improvements (SR 526 to SR 529) Non-Motorized Trail/Path Improvements <br /> 3. SE Everett Mall Way(SR 99 to SR 526) 1. Smith Island Bike and Pedestrian Improvements <br /> 4. Arterial Safety Projects 2. Bicycle Master Plan Implementation <br /> 5. Evergreen Way Improvements (41st St.to Gibson Road) 3. Fleming St.Bicycle Corridor <br /> 6. Evergreen Way Streetscape Improvements 4. Riverside Bus Pk.Ped.Trail(16th to N.Broadway) <br /> 7. I-5 to Port of Everett Truck Route 5. West/East Marine View Drive Bike-Ped Improvements <br /> 8. Mukilteo Blvd.Safety Imp. (Friday Ave.to City Limits) 6. 47th Street Ped Improvements (Evergreen to Black Forest Lane) <br /> 9. Arterial Needs Study 7. Pigeon Creek No. 1/BNSF Rail Line Crossing <br /> 10. Edgewater Creek Bridge Replacement 8. Grand Avenue/North Marina Ped-Bike Connection <br /> 11. Maple Heights Bridge Seismic Retrofit 9. Shoreline Access Imp. (Various Locations) <br /> 10. 36th St. (or vicinity)/BNSF Rail Line Ped/Bike Crossing <br /> Minor Arterials 11. Pigeon Creek Rd.No. 1 Improvements <br /> 1. 116th Street SE Street Improvements (SR 527 to 35th) 12. Everett Non-motorized Projects (Various Locations in Everett) <br /> 2. 100th Street SW Street Improvements (4th Ave.W.to Airport) 13. Lowell Snohomish River Road.Bike/Ped Connection <br /> 3. Casino Rd.Safety Improvements (Evergreen to 5th Ave.) 14. Riverfront District Bike/Ped Paths <br /> 4. 4th Avenue West Improvements (104th to 112th) 15. Interurban Trail Bike/Ped Path Improvements <br /> 5. 100th Street SE Improvements(SR 527 to 7th Ave SE) 16. Bicycle Detection Signals <br /> 6. 100th Street SE Improvements(7th Ave to Evergreen) 17. ADA Signals (Accessible Pedestrian Signals (APS)) <br /> 7. 110th Street SE Improvements(SR 527 to 35th St.) 18. ADA Ramps <br /> 8. Lenora St./Lowell-River Rd./BNSF Rail Line Xing 19. Waterfront Place Esplanade <br /> 9. Minor Arterial Streetscape Improvements Transit <br /> 1. Bus Replacements-2019 to 2024 <br /> Collector Arterials 2. Implementation of State CTR Law <br /> 1. East Everett Avenue/BNSF Overcrossing 3. Everett Station Repair and Updates <br /> 2. Bond Street Ped/Bike Improvements. (Kromer to Terminal) 4. Operation Base Relocation and Construction <br /> 3. Chestnut St. /Eclipse Mill Road.Improvements(Pacific to 36th) 5. Broadway Corridor Improvements <br /> 4. Silver Lake Road-121st Street SE Ped.Improvements 6. Safety and Security Enhancements <br /> 5. 37th Street Improvements (Rucker to Broadway) 7. On Board ITS replacement&upgrade <br /> 6. Collector Arterial Streetscape Improvements 8. Service Planning&Development Software/Hardware <br /> 9. Next Generation ORCA Project <br /> High Capacity Transit 10. Next Generation ORCA Project Cost Share w/Region <br /> 1. Light Rail-Lynnwood to Everett Extension 11. Waterfront/Riverfront Connector Service <br /> 2. Light Rail Stations 12. 80 Stall Park and Ride <br /> 3. HCT Support Program Port-Marine Industrial Transportation Improvements <br /> 1. Marine Terminals Maintenance and Expansion(in accordance <br /> Local Access and Other Projects with adopted Marine Terminals Master Plan) <br /> 1. BNSF RR safety improvements (Safety) 2. Marine Terminals:South Terminal Modernization Project <br /> 2. Local roadway safety projects (Safety) 3. Harbor and Snohomish River Federal Navigation Channel <br /> 3. Safe routes to schools (Safety) Improvements <br /> 4. SR 529 (W.Marine View Drive)Bulkhead Rehabilitation <br /> Everett 2019-2024 TIP-1 <br /> Projects in bold type not included in 2018-2023 TIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.