Laserfiche WebLink
Project PROJECT PRIO- PE RIW CONST. Est.2018-2023 LEAD MAP <br /> Numbei TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO. <br /> 1 Interstate 1 1-5 Downtown interchange improvements Pacific,Everett,Hewitt Ayes.,and US 2 Jan.19 Jun.19 Sep.20 $28,500,000 * EVERETT 1 <br /> 2 Interstate 2 1-5/100th Street SE HOV Access/Undercrossing I-5 at 100th Street SE Jul.19 Jan.19 Jan.20 $68,500,000 * EVERETT 2 <br /> 3 Interstate 3 NB Everett Mall Way to SB 1-5 Onramp Everett Mall Way to southbound I-5 Jan.19 May.20 $3,500,000 * WSDOT 3 <br /> 4 Interstate 4 1-5/Smith Island interchange 12th Ave.NE or SR 529 Jan.19 Jun.19 Jul.20 $10,000,000 * EVERETT 4 <br /> 5 Interstate 5 1-5/East Marine View Drive Interchange 1-5 at East Marine View Drive Jan.19 Jun.19 Jun.20 $16,000,000 * EVERETT 5 <br /> 6 Interstate 6 1-5 HOV Lanes US 2 to SR 528 Jan.19 Jun.19 May.20 $5,000,000 * WSDOT 6 <br /> 7 Interstate 7 1-5/128th Street Interchange 1-5 at 128th Street Jan.19 Jan.19 May.21 $2,000,000 * WSDOT 7 <br /> 8 Interstate 8 1-5/128th Street HOV Ramps(Mariner PNR) 1-5 at 128th Street/Mariner Park and Ride Jan.19 Jan.19 May.20 $6,000,000 * WSDOT 8 <br /> 9 Interstate 9 1-5/112th Street Interchange Study 1-5 at 112th Street SE Jan.19 $3,000,000 * WSDOT 9 <br /> 10 Freeway 1 US 2 Improvements 1-5 to SR 204 Jun.19 Jun.19 Jun.20 $3,000,000 " WSDOT 10 <br /> 11 Freeway 2 SR 526/Hardeson Road Interchange SR 526 at Hardeson Road Jun.19 Jun.19 Jun.21 $2,000,000 * WSDOT 11 <br /> 12 Freeway 3 SR 526 Extension Study SR 526 to US 2 Jun.19 $8,500,000 * WSDOT 12 <br /> 13 Freeway 4 SR 526/Evergreen Way Interchange SR 526 at Evergreen Way Jun.19 Jun.19 Jun.20 $38,000,000 * WSDOT 13 <br /> 14 Freeway 5 SR 526/40th Avenue West Intersection SR 526 and 40th Avenue West Jun.19 Jun.19 Jun.20 $500,000 * EVERETT 14 <br /> 15 Freeway 6 SR 529/Smith Island Ramps SR 529 at Smith Island Jun.19 Jun.19 Jun.20 $250,000 * WSDOT 15 <br /> 16 Principal Arterial 1 W.Marine View Dr./Rucker Ave./41st St.Freight W.Marine View Dr.,Rucker Ave,41st Street Sep.21 Jun.23 Jun.25 $42,800,000 ' EVERETT 16 <br /> 17 Principal Arterial 2 Broadway Corridor Improvements SR 526 to SR 529 Feb.19 Feb.19 Jun.20 $4,000,000 * EVERETT 17 <br /> 18 Principal Arterial 3 SE Everett Mall Way SR 99 to SR 526 Feb.19 Feb.19 Jun.20 $1,000,000 * EVERETT 18 <br /> 19 Principal Arterial 4 Arterial Safety Projects(Forest Pk entrances;1-EVarious Locations Jan.19 Mar.20 $900,000 * EVERETT <br /> 20 Principal Arterial 5 Evergreen Way Improvements,41st to Airport R 41st to Airport Road Jan.19 Jul.20 $1,000,000 * EVERETT 19 <br /> 21 Principal Arterial 6 Evergreen Way Streetscape Improvements 41st to Airport Road Jan.19 Jan.19 Jan.20 $20,000,000 * EVERETT <br /> 22 Principal Arterial 7 Interstate 5 to Port of Everett Truck Route Plan Port of Everett to 1-5 Jan.19 $200,000 EVERETT <br /> 23 Principal Arterial 8 Mukilteo Blvd.Safety Improvements Friday Avenue to city limits Feb.19 Apr.20 $3,300,000 ' EVERETT 20 <br /> 24 Principal Arterial 9 Arterial Needs Study Various arterials within city limits Feb.19 $200,000 * EVERETT <br /> 25 PrincipalArterial 10 Edgewater Cr.Bridge Replacement Mukilteo Blvd-Bridge at city limits Jun.19 Feb.21 $16,000,000 * EVERETT 21 <br /> 26 Principal Arterial 11 Maple Heights Bridge Seismic Retrofit Mukilteo Blvd-W of Glenwood Ave Dec.18 19-Mar $1,500,000 EVERETT 22 <br /> 27 Minor Arterial 1 116th Street SE Improvements SR 527 to 35th Street SE Jan.19 Jul.19 May.20 $3,800,000* EVERETT 23 <br /> 28 Minor Arterial 2 100th Street SW Improvements Airport Road to 4th Avenue West Feb.19 Jan.19 Jun.21 $3,600,000 * EVERETT 24 <br /> 29 Minor Arterial 3 Casino Road at 5th Ave.W.Road Intersection Ir Casino Road at Hardeson Road Mar.19 Mar.19 May.20 $500,000 * EVERETT 25 <br /> 30 Minor Arterial 4 4th Avenue West Widening and Improvement 104th Street to 112th St.SW Jan.11 Jan.12 May.20 $9,000,000 * SNO.CNTY. 26 <br /> 31 Minor Arterial 5 100th Street SE Improvements SR 527 to 7th Avenue SE Jan.19 Jan.19 May.20 $1,000,000 * EVERETT 27 <br /> 32 Minor Arterial 6 100th Street SE Improvements 7th Avenue SE to Evergreen Way Jan.19 Jan.19 May.20 $1,000,000 * EVERETT 28 <br /> 33 Minor Arterial 7 110th Street SE Improvements SR 527 to 35th Street SE Jan.19 Jan.19 May.20 $2,000,000 * EVERETT 29 <br /> 34 Minor Arterial 8 Lenora St./BNSF Rail Line Overcrossing Lenora St.&Lowell Sno.River Rd. Jul.19 Jul.19 May 20 $1,800,000 * EVERETT 30 <br /> 35 Minor Arterial 9 Minor Arterial Expansions and Streetscaping Various Locations Jan.19 Jan.19 May.20 $400,000 * EVERETT <br /> 36 Collector Arterial 1 East Everett Ave./BNSF Overcrossing East Grand Ave.to Railway Ave. Jan.19 Sep.19 Jun.20 $7,000,000 ' EVERETT 31 <br /> 37 Collector Arterial 2 Bond Street Ped/Bike Improvements Kromer to Terminal Ave. Jun.19 Jan.19 Jul.20 $100,000 * EVERETT 32 <br /> 38 Collector Arterial 3 Chestnut St./Eclipse Mill Rd.Improvements Pacific Ave.to 36th Street Jan.19 Jun.20 $3,350,000 * EVERETT 33 <br /> 39 Collector Arterial 4 Silver Lake Road-121st St.SE Ped.Improv. 112th Street to SR 527 Jun.15 Jun.19 Jul.20 $1,600,000 * EVERETT 34 <br /> 40 Collector Arterial 5 37th Street improvements and traffic signal Rucker Avenue to Wetmore Ave. Jun.19 Jun.20 $500,000 * EVERETT 35 <br /> 41 Collector Arterial 6 Collector Arterial Streetscape Improvements Various Locations Jan.19 Jun.19 Jul.20 $400,000 * EVERETT <br /> $321,700,000 <br /> * A portion or all of the funding for this project has not yet been committed. <br /> NOTE: Projects shown in bold type(if any)were not included in the 2018-2022 Six-Year TIP. <br /> Everett 2019-2024 TIP-2 <br />