Laserfiche WebLink
Utility District No. 1 of Snohomish County, Washington, relating <br /> to the construction of and payment for the Project. <br /> u. The word "System" means the existing sanitary sewage <br /> collection and treatment system of the City, including facilities <br /> for the collection and disposal of storm water runoff, as it now <br /> exists and as it may later be added to, extended and improved, <br /> and the existing water supply and distribution system of the <br /> City, including the interest of the City in the water supply <br /> facilities constructed by P .U.D. No. 1 of Snohomish County pur- <br /> suant to the Sultan River Project Agreement, as it now exists and <br /> as it may later be added to, extended and improved, for as long <br /> as the Bonds remain outstanding. <br /> v. The words "Term Bonds" mean any Parity Bonds identified <br /> as such in the ordinance authorizing the issuance thereof, the <br /> payment of which is provided for by a requirement for mandatory <br /> deposits of money into a "sinking fund account" in the Revenue <br /> Bond Fund. "2007 Term Bonds" means the Bonds maturing in the <br /> year 2007 . <br /> Section 2 . Plan of Additions to the System. The following <br /> plan for the acquisition, construction and installation of addi- <br /> tions and betterments to the water supply and distribution facili- <br /> ties of the System is hereby specified and adopted, to wit: <br /> The City shall acquire, construct and install a direct <br /> filtration water treatment facility at Lake Chaplain in the <br /> Sultan River Basin. Said facility is more fully described in <br /> plans and specifications therefor prepared by Gray and Osborne, <br /> Inc . and now on file with the City. <br /> The City shall provide all equipment, connections and appur- <br /> tenances together with all work as may be incidental and necessary <br /> to complete said facility, including, but not limited to, <br /> washwater disposal facilities, system separation and <br /> emergency pretreatment facilities. The foregoing facility shall <br /> -5- <br />