Laserfiche WebLink
80-13 ELECTRICAL PERMIT FEES. A fee for each electrical permit <br /> shall be paid to the Building Official as set forth herein: <br /> TYPE OF WORK FEE <br /> Single Family (New) <br /> 100 Amp $ 16.00 <br /> 150 20.00 <br /> 200 24.00 <br /> 300 30.00 <br /> 400 45.00 <br /> 500 56.00 <br /> 600 64.00 <br /> Over 600 75.00 <br /> Multiple Family (New) Same as for New Single <br /> Per Meter Family <br /> House Meter $ 16.00 <br /> New Circuits, Circuits $5.00 for 1 to 4 ckts $2.00 <br /> Extensions & Alterations each additional ckt <br /> Altered Services Under <br /> 600 Volts <br /> 100 Amp $ 10.00 <br /> 150 15.00 <br /> 200 20 00 <br /> 300 25.00 <br /> 400 35.00 <br /> 600 Amp or Over 55.00 <br /> Feeders & Altered Services <br /> Over 600 Volts <br /> 1 KVA or less $ 5.00 <br /> 5 KVA or less 10.00 <br /> 15 KVA or less 25.00 <br /> 20 KVA or less 30.00 <br /> 30 to 50 KVA 40.00 <br /> Over 50 KVA 50.00 <br /> Commercial <br /> Job Cost: <br /> $250 or less $ 10.00 <br /> $251 - $1,000 10.00 plus 2% <br /> $1,001 - $4,000 30.00 plus 1% <br /> Over $4,000 70.00 and 14 of 1% <br /> Signs $5.00 per circuit plus $5.00 <br /> for a meter service when not <br /> existing <br /> Temporary Service $ 10.00 Flat Charge <br /> Mobile Home $ 10.00 Flat Fee <br /> Motors $10.00 Flat Fee <br />