Laserfiche WebLink
• <br /> • <br /> 1 - 1 dwelling unit/lot: $1,074/lot <br /> - 2 dwelling units/lot: $1,568/lot <br /> 2 - 3 or more units/lot: $692 per dwelling unit X <br /> officials) estimate of dwelling <br /> 3 units per lot. <br /> 4 E. Each lot in a proposed subdivision, plat or short subdivision in the <br /> Southwest Everett area (Area 5 on the map attached) shall be <br /> 5 charged as follows based on said official(s)' estimate of the number <br /> of dwelling units which may be constructed on each lot created: <br /> 6 <br /> - 1 dwelling unit/lot: $926/lot <br /> 7 - 2 dwelling units/lot: $1,352/lot <br /> - 3 or more units/lot: $697 per dwelling unit X <br /> 8 official(s)' estimate of dwelling <br /> units per lot. <br /> 9 <br /> Provided that in the event that a lot to be subdivided is assessed <br /> 10 with the cost of construction of the Southwest sewer interceptor, <br /> then the fee for each lot created shall be: <br /> 11 <br /> - 1 dwelling unit/lot: $339/lot <br /> 12 - 2 dwelling units/lot: $496/lot <br /> - 3 or more units/lot: $219 per dwelling unit X <br /> 13 official(s) estimate of dwelling <br /> units per lot <br /> 14 <br /> The total fees for all lots shall be collected by the City prior to approval <br /> 15 of the subdivision or short subdivision. <br /> Map on file in City Clerk's Office. <br /> 16 <br /> 17 <br /> 18 AYOR <br /> ATTEST: <br /> 19 <br /> 20 <br /> C CLERK - ry <br /> 21 <br /> 22 Passed: ?- 9."S7/ <br /> 23 Valid: 9- /0 - 5-/ <br /> 24 Published: r-/3- 1/ <br /> 25 <br /> 26 <br /> 27 <br /> 28 <br /> 29 <br /> 30 <br /> 31 <br /> 32 <br /> -4- <br />