Laserfiche WebLink
I <br /> . <br /> 9. <br /> sv f Residential Photovoltaic OTC Permit Application <br /> Y <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PI/system meets the requirements listed <br /> in this Checklist.All project plans and supporting documentation must be provided on site for the Inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> 1 <br /> Project Information <br /> Property Owner Name: lei i Sheets <br /> Protect Address:. OS 'iā€¢gemont"I nve' Parcel# <br /> I Cit Everett State: WA _ ZIP: 98203 ` <br /> Day Phone: 206-391-2603 <br /> Contractor Name ' NW Wind &Solar <br /> Contractor License#: SME*066D8 <br /> Contractor Day Phone: 206-391-2603 <br /> PV system description Module: ITEK 300 SE <br /> i, , (include manufacturer Inverter: PVI 7600 TL- ITEK <br /> and model#of PV <br /> modules and <br /> Inverters : ' <br /> Determine if your project qualifies for ei expedited permitting: <br /> , Yes No <br /> 1, PV system is designed and proposed for a detached one-or two-family dwelling or <br /> 1 townhouse not more than three stories above grade or detached accessory structure that Cl <br /> Is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules, [iRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by Ki rj <br /> the local Jurisdiction. <br /> g 3, Rooftop Is made from lightweight material such'as a single layer of composition shingles, <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's Instructions.[IRC M2302,2) 12 0 <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> I required electrical permits)must be obtained from the Authority Having Jurisdiction to [X <br /> administer the electrical code,[IRC M2302.2) <br /> 6, The Installation shall meet the requirements of the international Fire Code as amended ,x <br /> LI q <br /> by WA State.[IRC M2302.2) <br /> 7, The PV system is designed for the wind speed of the local area,and will be Installed per <br /> Et( p <br /> the manufacturer's specifications,[IRC M2302,2.1(1)) , <br /> 1 8. The ground snow load does not exceed 70 pounds per square foot,[MC M2302,2.1(2)J i. Gi <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> Igh no momthan:lour pounds persquare foot,f i CM 302.2.1(3)) ' 121 ' 0 <br /> Enter total Ottoload <br /> of system(ibs/ 2)t, 3;12 ' <br /> 10, To address uplift,modules are mounted no higher than 18"above the surface of the rN o <br /> roofing to which they are affixed.[MC M2302,2,1(4)) <br />